RFB-67-21 Greenbo and Carter Caves Lodge Roof Replacement
RFB-67-21 Greenbo and Carter Caves Lodge Roof Replacement
Estimate:
$705,500.00
Estimated Length of Project:
90 (Substantial Completion) + 21 (Final Completion)
The project consists of removal of existing shingle and built-up roofing systems, installation of new asphalt shingle and modified bitumen roofing systems over existing building, remove existing wood siding at gable ends, install new fiber cement board siding at gable ends, miscellaneous minor repairs to roof edge condition, and roof edge drainage systems as follows:
1. At Carter Caves State Resort Park:
a. Removal and replacement of asphalt shingles.(Areas ‘A’, ‘B’, ‘C’ ‘D’ & ‘E’)
i. New vented nail base insulation at Guestrooms.
1. 2.75″ insulation, 1″ airspace & 5/8″ OSB.
ii. New 50-year asphalt shingles.
iii. Synthetic underlayment.
iv. Ice and Water shield at perimeters.
b. Removal and replacement of gutters and downspouts at Roofs ‘A’, ‘B’, ‘C’ ‘D’ & ‘E’
i. New gutters and downspouts to match existing size and shape.
ii. Materials to be 24 ga. Pre-finished galvanized.
c. Exterior masonry at Chimney over Roof ‘A’ to have 100% re-pointing and sealer.
d. Existing drain lines to be jet cleaned and noted damaged areas repaired.
i. After cleaning, drain lines to be inspected via camera and any additional repairs to be completed via CO.
e. New drain lines to be installed at Conference Center grade to catch drainage from Areas ‘F’ & ‘G’ & expelled to hill side.
i. Roof ‘E’ & ‘F’ to have new drain lines installed and drainage to be expelled to hill side.
2. At Greenbo State Resort Park:
a. Removal and replacement of asphalt shingles.(Areas ‘A’ & ‘J’).
i. New vented nail base insulation at Guestrooms.
1. 4″ insulation, 1″ airspace & 5/8″ OSB.
ii. ii. New 50-year asphalt shingles.
iii. Synthetic underlayment.
iv. Ice and Water shield at perimeters.
b. Removal and replacement of mansard shingles: (Areas ‘B’, ‘C’, ‘D’, ‘E’, ‘F’ & ‘H’).
i. New 50-year asphalt shingles.
ii. Synthetic Underlayment.
iii. Ice & Water Shield at Perimeters.
c. Removal and replacement of SBS flat roofing (Areas ‘B’, ‘C’, ‘E’, ‘F’, ‘H’ & ‘I’).
i. R-25 insulation slope in deck at ‘H’ & ‘I’.
ii. R-25 + 1/4″ taper at Areas ‘B’, ‘C’, ‘E’ & ‘F’.
d. Removal and replacement of gutters and downspouts at Roofs ‘A’ & ‘J + Copper gutter repairs at Areas ‘B’, ‘C’, ‘D’, ‘E’, ‘F’, ‘H’ & ‘I’.
i. New gutters and downspouts to match existing size and shape.
ii. Materials to be 20 oz. copper.
e. Exterior masonry at Chimney over Roof ‘E’ to have 100% re-pointing and sealer.
f. Existing drain lines to be jet cleaned.
i. After cleaning, drain lines to be inspected via camera and any additional repairs to be completed via CO.
g. New drain lines to be installed at Conference Center grade to catch drainage from Areas ‘D’, ‘F’ & ‘H’ & tapped into existing yard drains.
Project Location: Various