Author Archive

Spencer County Fiscal Court – Spencer County Pavilion/Farmers Market

Spencer County Fiscal Court – Spencer County Pavilion/Farmers Market

This project consists of a pavilion and farmer’s market for the Spencer County Spencer Court.

Project Location: Taylorsville, Kentucky

More Details

Shelby County Public Schools – Martha Layne Collins High School Fieldhouse Addition

Shelby County Public Schools – Martha Layne Collins High School Fieldhouse Addition

The Martha Layne Collins High School Fieldhouse Addition project will be for the construction of a 12,000 Sqft
Fieldhouse Addition to an existing concession building. New work includes baseball and softball locker rooms,
hitting and pitching area, along with an indoor practice field.

Project Location: Shelbyville, Kentucky

More Details

Blue Grass Airport – Terminal Drive Relocation and Parking Expansion

Blue Grass Airport – Terminal Drive Relocation and Parking Expansion

This project consists of construction of construction of a relocated and extended Terminal
Drive; construction of additional parking lots. Major line items of work to include: 900+ additional
parking spaces; one half mile of new Terminal Drive; 3,000 tons of new hot mix asphalt; one half
mile of storm sewer pipe; 7,000+ square feet of combined hardscape, sidewalk, and landscaping; a
new utility corridor; 5,000+ linear feet of new curb and gutter; 500 linear feet of sheltered walkway;
and a new exit toll plaza with building.

Project Location: Lexington,Kentucky

More Details

RFB-222-25 DMA – Walton RC Restroom Restoration

RFB-222-25 DMA – Walton RC Restroom Restoration

Estimate:
$846,035.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The project consists selective demolition and subsequent renovation of areas within the Walton National Guard Armory located at 183 Beaver Road, Walton, KY. Work includes demolition of existing Men’s & Women’s latrines, removal and subsequent offsite disposal of existing architectural finishes, plaster and acoustic ceiling systems, ceramic tile and vinyl flooring, concrete slabs, doors, hardware, concrete masonry partitions, plumbing, mechanical and electrical improvements. .
New work to be performed includes installation of new Men’s and Women’s Restrooms including new metal frame partitions, new fixtures and finishes, new phenolic plastic partitions and screens, new individual shower enclosures, lockers and benches. Finishes shall include new painted gypsum panel ceilings and walls, new acoustic tile ceilings, new porcelain tile wall finishes, new MMA flooring and base, solid surfacing countertops and stainless toilet accessories. New plumbing fixtures, light fixtures, switches and receptacles will also be installed. Adjacent to the Women’s Toilet Room will be a Lactation Room with acoustic ceiling, painted gypsum panels walls, MMA flooring, plastic laminate casework, lighting, switches and receptacles. In addition one, HC Metal exterior door is to be replaced in the Assembly Hall.

Project Location: Walton

More Details

KEC Expansion KSFB – State Fair Board Property Improvements Phase 1 – Bid Package 03 – Struct Steel

KEC Expansion KSFB – State Fair Board Property Improvements Phase 1 – Bid Package 03 – Struct Steel

Project description – Early sitework and enabling
projects include utility replacement / relocation
to accommodate the new multi use bldg. Site
grading, storm, sanitary sewer, and water service
is included in this bid set. This bid set also includes
structural foundations and slabs of the new bldg.

Project Location: Louisville, Kentucky

More Details

City of Marion – West Elm Street, West Poplar Street, and Country Drive Waterline Replacements

City of Marion – West Elm Street, West Poplar Street, and Country Drive Waterline Replacements

The scope of work includes the installation of approximately 4,190 LF of 6-inch DI waterline, 25
LF of 2-inch PVC waterline, 1,822 LF of ¾ -inch HDPE service line, 5 fire hydrant assemblies,
and related appurtenances.

Project Location: Marion, Kentucky

More Details

Cumberland Family Medical Center – Glasgow Pediatric Healthcare Renovation/Addition

Cumberland Family Medical Center – Glasgow Pediatric Healthcare Renovation/Addition

This project consists of the following bid packages: special inspections, earthwork, asphalt, concrete,
masonry, structural steel, general construction, roofing, storefront and windows, drywall, floor
coverings, acoustical ceiling, painting, casework, window coverings, plumbing, HVAC, sprinkler and
electrical.

Project Location: Glasgow, Kentucky

More Details

RFB-224-25 FSS – Old State Capitol Annex Renovation – Selective Demolition

RFB-224-25 FSS – Old State Capitol Annex Renovation – Selective Demolition

Estimate:
$652,000.00

Estimated Length of Project:
90 (Substantial Completion) + 5 (Final Completion)

The Old State Capitol Annex Renovation – Selective Demolition Package project is an above ceiling investigation and stabilization of existing structural conditions of the building. The elements of the project include but are not limited to ceiling removal at multiple floors, structural stabilization repairs both temporary and permanent, and MEP equipment selective removal, as noted, to maintain power and fire protection requirements of the Old Kentucky State Capitol Building which is located next to the Old Annex Building. The building systems shall remain operational to maintain conditioned space in this historic structure.

Project Location: Frankfort

More Details

CCK-2563.30-19-25 AAC BP07 Core & Shell Group 5 Landscaping

CCK-2563.30-19-25 AAC BP07 Core & Shell Group 5 Landscaping

The Cancer Treatment Center and Advanced Ambulatory Center will be a state-of-the-art
facility providing cancer care and research to treat patients across Kentucky. The full scope of
the program is combined in 3 project parts: Upgrades to Elizabeth Street and roadways on the
west side of the medical campus, Site and Utility upgrades, and a 9 level (including a
mechanical penthouse) 563,475 GSF Cancer Treatment Center (CTC) and Advanced
Ambulatory Center (AAC). The CTC AAC serves both inpatients and outpatients with the
lower 3 floors capable of treating inpatients. The program includes Radiation Medicine,
Imaging Services, Lab, Cancer Urgent Care, an Ambulatory Surgery Center, various cancer
and not cancer clinics, infusion, and women’s cancer services. A divided sky bridge
connection will connect to Pavilion A, primarily for the movement of families, visitors,
ambulatory patients, and staff. The site design provides generous, welcoming landscape
space to create a distinctive healing environment.

• TC32E7 Landscape is the only Landscape trade available for bidding.

Bid Package 7 Group 5 Landscape is the final site bid opportunity for the new Cancer
Treatment Center and Advanced Ambulatory Center.

Project Location: Lexington, Kentucky

More Details

RFB-221-25 HVAC Replacement/Replace Building Automation System Barren River State Resort Park Department of Parks

RFB-221-25 HVAC Replacement/Replace Building Automation System Barren River State Resort Park Department of Parks

Estimate:
$2,777,000.00

Estimated Length of Project:
240 (Substantial Completion) + 30 (Final Completion)

The Work of Project is defined by the Contract Documents and consists of the following:

Main lodge building: All controls for existing and new equipment will be replaced. Replace heating and cooling equipment one for one. Exhaust fans are to remain. Add cooling to kitchen make up air #1. Eliminate use of 1996 kitchen make up air unit #2. Chiller is replaced and pumps and piping will be replaced as necessary to install new chiller size. Provide pipes with quick connect valves for temporary chiller.

Lodge guest rooms: Replace packaged terminal units, exhaust fans, and add tempered outside air using a dedicated outside air unit with energy recovery.

Project Location: Lucas

More Details

RFB-214-25 Jefferson County-Renovation Youth Detention Center Department of Juvenile Justice

RFB-214-25 Jefferson County-Renovation Youth Detention Center Department of Juvenile Justice

Estimate:
$31,414,754.00

Estimated Length of Project:
670 (Substantial Completion) + 60 (Final Completion)

The scope of work includes Renovations and a New Construction Addition to a previously operated jail in Jefferson County, Kentucky. The facility tops out at 3 stories with a basement, 1 and 2 story elevations are present as well. The Primary existing Structure is Cast Concrete columns, beams, floor, and roof elements. A secondary structure supported with steel columns and roof structure is present in the gymnasium. The buildings architectural façade consists of Precast, Masonry, and EIFS surfaced masonry.
The New Construction Contract includes the Renovation of the facility into a State Owned and Operated Juvenile Detention Center. Occupying the Basement, First and Second Floors with New program and a Limited Addition. The Third-floor renovations are limited to life safety upgrades. The Renovation and Addition will encompass approximately 9,000sf of Addition and 55,000sf of Full Renovation program.
New Construction Features Shall Include the following:
-Structural Construction will include reinforced masonry, cast in place concrete, and structural steel framing.
-Entire Roof System Replacement
-Architectural Walls, Ceilings, and Finishes
-Commercial Doors / Windows, Frames, Hardware
-Contractor Furnished-Contractor Installed (CFCI) FF&E
-Electric Traction Elevator Systems
-Detention Walls and Ceilings
-Detention Doors / Windows, Frames, Hardware
-Security Control System, PLC, VGUI, Video Surveillance
-Fire Alarm, Automatic Suppression Systems
-HVAC and Plumbing Systems
-Electrical and Lighting Systems
-Telecom Systems
-Site and Courtyard Improvements

Project Location: Louisville

More Details

CC-386B-25 Central Water Plant Chilled Water System Upgrades

CC-386B-25 Central Water Plant Chilled Water System Upgrades

This project is for Central Plant #2 Chiller Replacement. Project consists of a chilled water and condenser
water upgrades at the Central Plant. This includes removal of existing water cooled chiller #2, installation of a
new water-cooled chiller #2 with variable frequency drive and installation of a new HDPE induced draft
cooling tower. A control upgrade for the chilled water system and condenser water system will be included.

Project Location: Murray, Kentucky

More Details

RFB-220-25 KSU – Roof Repairs and Replacement – Bradford Hall

RFB-220-25 KSU – Roof Repairs and Replacement – Bradford Hall

Estimate:
$315,000.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The project consists of the removal & replacement of wet areas in existing roof areas, and the installation of an overlay roof system on others. The overlay roof system is 2-ply modified bitumen roof membrane on ½” cover board. New flashings & edge metal should be included with the overlay system.

Project Location: Frankfort

More Details

CCK-2563.30-18-25 AAC BP08 Fit Out Group 2

CCK-2563.30-18-25 AAC BP08 Fit Out Group 2

The Cancer Treatment Center and Advanced Ambulatory Center will be a state-of-the-art
facility providing cancer care and research to treat patients across Kentucky. The full scope of
the program is combined in 3 project parts: Upgrades to Elizabeth Street and roadways on the
west side of the medical campus, Site and Utility upgrades, and a 9 level (including a
mechanical penthouse) 563,475 GSF Cancer Treatment Center (CTC) and Advanced
Ambulatory Center (AAC). The CTC AAC serves both inpatients and outpatients with the
lower 3 floors capable of treating inpatients. The program includes Radiation Medicine,
Imaging Services, Lab, Cancer Urgent Care, an Ambulatory Surgery Center, various cancer
and not cancer clinics, infusion, and women’s cancer services. A divided sky bridge
connection will connect to Pavilion A, primarily for the movement of families, visitors,
ambulatory patients, and staff. The site design provides generous, welcoming landscape
space to create a distinctive healing environment.

Project Location: Lexington, Kentucky

More Details

RFB-219-25 EEC-AML-23093AMLBAML-BIL

RFB-219-25 EEC-AML-23093AMLBAML-BIL

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

A slide has occurred on the slope behind/beside the citizen’s residence impacting yard drainage, as well as multiple open portals on the bench behind the residence (and upstream). This project will address the slide by stripping the slide material to rock. Two portals immediately upslope will be closed with standard wildlife closures and drainage conducted to the strip to rock area via concrete block tied mat ditches. Drainage from and across the strip to rock area will be routed through an excavated rock ditch to a drop box/head wall at the yard edge. A combination ditch
will also be installed at the toe of the slope to collect drainage, which will flow into the drop box/head wall structure, culvert and standard headwall outlet to the creek. 5 additional portals (partially collapsed) east of the slide area will also be opened, drained and closed with wildlife closures. 40LF of subdrain is included to collect drainage at the portals for discharge into a natural drain. All waste generated by construction activities will be transported to an approved waste area 5.5 miles from the project site. At the waste area, a failing culvert under a section of access road will be replaced to promote hauling to the waste deposition area

Project Location: Pike County

More Details

RFB-218-25 CHFS – HZLD – Replace Nurse Call System

RFB-218-25 CHFS – HZLD – Replace Nurse Call System

Estimate:
$325,000.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The Project involves installation of a new nurse call system to serve patient care areas as indicated on the bid documents. All work must be performed in a sequenced effort coordinated with the hospital. The Contract Documents include a suggested construction phasing schedule. However, it is the responsibility of the Contractor to prepare and submit a schedule of work.

Project Location: Louisville

More Details

RFB-24-001 Somerset CC Stoner Chiller Replacement

RFB-24-001 Somerset CC Stoner Chiller Replacement

Estimate: $262,000.00

Estimated Length of Project: 150 (Substantial Completion) + 30 (Final Completion)

This project includes the chiller replacement for Stoner Hall at Somerset Community College. The new chiller will be air-cooled scroll type with all new hydronic pumps. Also includes all associated HVAC piping and electrical work.

Project Location: Somerset

More Details

RFB-217-25 Roof Replacement Supply Branch Facility Fire July 2024 Kentucky State Police

RFB-217-25 Roof Replacement Supply Branch Facility Fire July 2024 Kentucky State Police

Estimate:
$312,000.00

Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The project consists of the removal and replacement of a section of damaged existing structural metal roof deck and existing roof systems; the installation of new exterior windows & interior/exterior doors; the construction of a small, single room office; extensive electrical system & mechanical system renovations throughout the noted area of the building.

Project Location: Frankfort

More Details

RFB-215-25 Renovate Edgewood Campus Gateway Community & Technical College Kentucky Community & Technical College System

RFB-215-25 Renovate Edgewood Campus Gateway Community & Technical College Kentucky Community & Technical College System

Estimate:
$2,752,531.00

Estimated Length of Project:
450 (Substantial Completion) + 30 (Final Completion)

The 33,000-square-foot Student Services Center renovation at Gateway Community and Technical College’s Edgewood Campus focuses on improving functionality, accessibility, and building systems to serve students, faculty, and staff better. Phase 1 includes upgrades to key service areas, modernization of interior finishes, improvements to restroom facilities, and replacement of outdated lighting with energy-efficient solutions. The existing elevator will be upgraded to meet current accessibility and safety standards, and door hardware will be replaced to enhance security and compliance with accessibility requirements.
The project includes new flooring throughout the facility, with LVT and carpet tile in common areas, carpet tile in offices, LVT in clinical spaces, and ceramic tile in restrooms for durability and ease of maintenance. Acoustical ceiling systems will be installed to improve sound quality, with specialty ceilings incorporated in select areas to define and enhance key spaces. Casework and storage solutions will be finished with high-pressure laminate for longevity, and all walls will receive new paint finishes to provide a cohesive and updated interior environment.
The commons area will be updated with custom wall and window graphics that integrate elements of the Gateway community’s identity, creating a more cohesive and engaging space. The renovation is designed to align with the college’s long-term goals for improving campus facilities, supporting student services, and enhancing the overall built environment.

Project Location: Edgewood

More Details

RFB-212-25 Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice

RFB-212-25 Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice

Estimate: $515,726.00

Estimated Length of Project:
240 (Substantial Completion) + 30 (Final Completion)

The work of this project consists of:
a. Renovating 3 bathrooms on the second floor.
b. Make all three bathrooms ADA accessible
c. Two bathrooms will be renovated to enter from the corridor.
d. Upgrade plumbing equipment in affected spaces.
e. Upgrade mechanical equipment in affected spaces.
f. Upgrade electrical equipment in affected spaces.
g. New finishes in affected spaces.
h. Abandon and cap/remove plumbing from non-usable bathroom facilities on second floor.
i. Water cooler replacement on first floor
j. Installation of water line shut off valves
k. Replace existing light fixtures with LED light fixtures

Project Location: Morehead

More Details

Global Way 3 MG Prestressed Concrete Tank & Pump Station / Double Eagle Pump Station Replacement

Global Way 3 MG Prestressed Concrete Tank & Pump Station / Double Eagle Pump Station Replacement

The work under this contract for Package A includes the installation of a new 3 MG wire wrapped
prestressed concrete tank and appurtenances, a new package pump station yard piping, electrical/
instrumentation work, structural work, sitework, and other items required to complete the project.

The work under this contract for Package B includes demolition of the existing pump station and
appurtenances, demolition of existing yard piping, installation of a new package pump station, yard
piping, electrical/instrumentation work, structural work, sitework, valve vault modifications and other
items required to complete the work.

Project Location: Burlington, Kentucky

More Details

Pond Creek Flood Pump Station Water Line Project

Pond Creek Flood Pump Station Water Line Project

INVITATION TO BID

Sealed Bids will be received electronically by Louisville and Jefferson County Metropolitan Sewer District, for the construction of Pond Creek Flood Pump Station Water Line Project, Contract No. 17290, Budget ID No. F25128, Drawing Record No. / Sheet No. 17290/1-6, until 10:30 AM, Local Time, Thursday, April 10, 2025, and will be publicly opened and read at that time. The public may attend the bid opening via teleconference call at 502-654-8113 (Dial-in Number) Conference ID: 648 319 098#.

MSD is using a web-based portal for accepting and evaluating bid proposals digitally at http://louisvillemsd.bonfirehub.com/portal for this Invitation to Bid. Documents may be uploaded at any time during the open period indicated for each proposal.

Description and location of Project: The installation of 2400 + LF of 6-inch water line and other appurtenance work. All work shall be done in accordance to MSD’s Standard Specifications.

There will be a non-mandatory pre-bid meeting held for this project. The pre-bid meeting will be held on Thursday, April 3, 2025 at 10:00 AM at the Pond Creek Flood Pump Station /7805 Stites Station Road (Highway 44), West Point, KY 40177.

The Engineer’s Construction Cost Estimate for this project is between $400,000.00 and $500,000.00.

Proposal forms, including Specifications and Instructions for Bidders, may be obtained from MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

Persons wishing to view the bid documents may do so online at http://louisvillemsd.bonfirehub.com/portal or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joshua A. Dickerson. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD’s designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $200,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms.

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s designated web portal at http://louisvillemsd.bonfirehub.com/portal.

MSD SUPPLIER DIVERSITY PROGRAM: Applicable

The MSE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: x
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

Butler County Public Library Board – Butler County Public Library

Butler County Public Library Board – Butler County Public Library

This project consists of the Butler County Public Library for the Butler County Public Library Board.

Project Location: Morgantown, Kentucky

More Details

RFB-201-25 KSU – Chandler Hall Renovation

RFB-201-25 KSU – Chandler Hall Renovation

Estimate:
$8,505,792.00

Estimated Length of Project:
(Substantial Completion) + (Final Completion)

Chandler Hall is a four-story, 120-bed dormitory at Kentucky State University, originally built in 1938 and renovated in 1977 and 1993. The current renovation project aims to comprehensively overhaul the building to enhance its envelope performance, mechanical, electrical, plumbing systems, overall functionality, aesthetics and make it fully accessible. . The renovation will include the complete gutting and rebuilding of dorm rooms, restrooms, and common areas, ensuring compliance with ADA standards. The mechanical, electrical, and plumbing systems will be entirely updated, including the installation of new fan coil units, dedicated outside air system, ductwork, and controls. The project also includes the refurbishment of the elevator and the replacement of all interior finishes, ensuring a modern and comfortable living environment for the residents.

Project Location: Frankfort

More Details

RFB-209-25 EEC-AML-23066AMLBAML-BIL

RFB-209-25 EEC-AML-23066AMLBAML-BIL

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The project area is 3.2 acres. A slide in front of a residence has threatened the home and risks sliding material into the road below. The project will consist of two phases.

Project Location: Pike County

More Details

Subscribe