Lextran Headquarters Complex Bid Package 2

Lextran Headquarters Complex Bid Package 2

The Lextran Headquarters Complex consists of three newly constructed buildings including an administrative, maintenance and fuel/wash facilities. The property is 13.7 acres at the corner of Louden and Broadway. The physical address is 200 West Louden St.

The administrative building is approximately a 24,000 SF two story steel framed structure with a metal panel and storefront façade. The roof is EPDM. A combination of grade beams and spread footings will act as the foundation for the structural level. Bar joists will support the elevated slab and roof decks. All concrete in the administrative building is polished except for ceramic tile at the restrooms, showers and lobby. Wall construction at the admin building is metal stud except for the elevator chase which is concrete block. The admin building will serve not only office areas but will act as the dispatch for drivers. The driver’s area will include a break, excursive, lockers and restroom/shower facilities. The first floor lobby will act as the reception area that separates the public side of the building from the operations side, this includes a large conference room with divider and restrooms/ Interior walls will allow transfer of natural daylight. Rough-in for security and access control is included but cabling and system installation is by others. The HVAC for all facilities will be via roof top units.

The maintenance building is approximately 26,658 SF light frames steel structure consisting of 7 high bay garages, [arts storage, shop areas, training and administrative facilities. Flooring is sealed concrete. Garage bays will receive a shake hardener. 5 bays will have permanent lifts. Lextran anticipates transitioning from a diesel bus fleet to compressed natural gas. This facility will be CNG ready. Demising walls are concrete block or metal stud with gyp. Roof is EPDM.

The fuel/wash buildings total 5,400 SF with a canopy covering after the fueling lane in between the two structures. Walls are concrete block with concrete floors. Roof is hollow core with EPDM. This facility will also be CNG ready.

Bid Package 2 includes all work to complete this project

WC02-A General Trades
WC02-B Masonry
WC02-C Flat Work/Polished Concrete
WC02-D Steel
WC02-E Precast
WC02-F Glazing/Metal Panels
WC02-G Roofing/Skylights
WC02-H Doors, Hardware, Security
WC02-I Overhead Doors
WC02-J Flooring
WC02-K Finish Carpentry
WC02-L Drywall and ACT
WC02-M Painting and Sealed Floors
WC02-N Fire Protection
WC02-O Mechanical
WC02-P Electrical and Low Voltage
WC02-Q Final Cleaning
WC02-R Elevator
WC02-S Bus Lifts
WC02-T Bus Wash
WC02-U Fueling
WC02-V Landscaping
WC02-W Fencing
WC02-X Specialties

Lexington, KY