CC-396L-26 Hester Hall Aquatherm Piping Replacement

CC-396L-26 Hester Hall Aquatherm Piping Replacement

The project consists of the demolition and replacement of all Aquatherm water mains, branches and valves. This
is located on floors one (1) through eight (8), and the penthouse. This excludes all the water loops located on
floor eight (8), which will be listed as an alternate. The project also consists of the installation of new shower
fixtures in all showers.

Project Location: Murray, Kentucky

More Details