RFB-82-26 EEC-AML-24011AMLBAML

RFB-82-26 EEC-AML-24011AMLBAML

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

Drainage from eligible works are located upslope of the citizen’s residence impacting the residence and yard area. A slide has also occurred on the slope behind/beside the citizen’s residence impacting yard drainage. This project addresses the slide removing a quantity of material and grading the remainder in place in a stable configuration. A Concrete Block-Tied Mat ditch will be installed from the top of the slide to a planned drop box at the toe. Drainage will also be collected by installation of subdrain along the toe of the highwall. All collected drainage will be routed to a second drop box installed on the existing pipe crossing KY-194 and
ultimately the roadside ditch. Concrete Block-Tied Mat ditches will also be installed to control surface drainage from the adjacent roadway and conduct drainage down the slope to the drop box and existing culvert. All material generated by construction activities will be wasted onsite.

Project Location: Pike County

More Details