Morehead Utility Plant Board – Contract 2 – Regional Water Treatment Plant
Morehead Utility Plant Board – Contract 2 – Regional Water Treatment Plant
PLEASE NOTE: Due to technical difficulties, Morehead-Contract 2 – Vol 3 is CURRENTLY UNPRINTABLE. The file is VIEWABLE in the download or by clicking the SPEC TAB above.
Click Here for Electrical Site Sheets
The primary scope of work includes construction of a new 12.0 MGD water treatment plant in a
location that will facilitate the connection to the existing system and the proposed raw water
transmission main. The new WTP will include: a flash mix system, a flocculation basin, a 12.0
MGD membrane pressure filtration system, a granular activated carbon adsorption system,
chemical storage and feed systems, a 2.6 MG clearwell, three washwater lagoons, operation and
laboratory facilities, and appurtenances on the water treatment plant site.
Project Location: Morehead, Kentucky