CCK-2320-18 College of Nursing – Caulking
CCK-2320-18 College of Nursing – Caulking
PROJECT DESCRIPTION:
1. The existing building is consisting of exterior concrete hung panels and masonry with
ribbon aluminum windows and storefront. There is a bridge connecting the 2nd floor at
the southeast façade. The roof is EPDM with ballast. A later addition connects the
existing building at the northwest and southwest up to the 3rd floor.
2. The scope of the work is to remove and discard existing caulk and backer rod at all
concrete vertical and horizontal joints, windows, storefront, door frames, louvers/vents,
and at all material transitions. Install new backer rod and caulk at areas where previous
backer rod and caulk was removed. Remove and discard caulk at termination bars at
roof and install new caulk. Install surface mounted reglet counterflashing system at all
roof termination bars. Refurbish and reinstall existing counterflashing and apply caulk.
Remove and discard existing flashing at bridge connection and install backer rod and
caulk with a surface applied reglet system at the head of the skylight of the bridge. Patch
and repair all spalled concrete including cleaning oxidized rebar and coating with epoxy.
Patch and repair ceiling cracks.
Project Location: Lexington, Kentucky