RFB-29-26 EEC-AML-24006AMLBAML

RFB-29-26 EEC-AML-24006AMLBAML

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

This Site will consist of the removal of an existing silt pond. The construction of 2 each Silt Trap (Rock) to catch silt during the removal of silt pond, then taken out. The construction of 140 linear Foot of Class III Ditch 4’ Flat Bottom along spillway of pond. The installation of 350 LF of Concrete Block-Tied Mat in drain way to promote positive drainage. The construction of 36” HDPE pipe in access road and 2 each slopped and flared headwalls.
Mobilization is setup to provide for construction equipment to be delivered to the site. Site Prep is included, at the site for reclamation and material storage. Revegetation is included for all revegetation efforts within the site. Grout is included to seal up the Standpipe for the pond. Roadway Stone are included to provide for access during normal reclamation. Bituminous repair is included to replace IN KIND and surfaces disturbed. Earthwork work bid item is included to excavate pond dam and other areas as directed by the ENGINEER. Material will be wasted in pond area.

Project Location: Letcher County

More Details