RFB-101-23 DOC – KCIW Sewage Plant Connect to Regional Facility
RFB-101-23 DOC – KCIW Sewage Plant Connect to Regional Facility
Estimate : $1,126,113.00
Estimated Length of Project:
See S.C. (Substantial Completion) + 30 (Final Completion)
The KCIW Regional Wastewater Connection Project consists of construction of approximately 1,137 LF of 10-inch, 12-inch, and 18-inch PVC gravity sewer, of which approximately 70 LF being installed within a bored and/or jacked 30″ steel casing pipe across Ash Avenue (KY-362), a structure containing two wastewater channel grinders and a manual bar screen, diesel backup generator, a precast flow measurement structure, site drainage improvements, and decommissioning of the existing wastewater treatment plant.
Work shall be performed as described in the plans and specifications titled KCIW Regional Wastewater Connection. The project site is located at the Kentucky Correctional Institute for Women, 2460 Ash Avenue, Pewee Valley, KY 40056
Project Location: Peewee Valley