RFB-113-22 Governor's Mansion Penthouse Repairs

Order

RFB-113-22 Governor's Mansion Penthouse Repairs

Contact

Company Contact

Division of Engineering and Contract Administration
Susan Ward
Location

Location

Frankfort

Pre-Bid Information

Pre-Bid Information

Bid Information

Bid Information

01/26/2022 02:00 PM ET
Site Visit Information

Site Visit Information

For additional information go to https://finance.ky.gov/eprocurement/pages/default.aspx

Description

Description

Estimate: $ 81,840.00
Estimated Length of Project: 60 (Substantial Completion) + 15 (Final Completion)

The Architectural scope of work for the Governor’s Mansion Penthouse Repairs includes the following: Install Spray foam insulation on the exterior walls and the roof deck. Repair Plaster areas of deterioration in the stairwell on the exterior walls Install new gypsum board on the exterior walls and the ceilings, finish, prime and paint. Paint all remaining walls and trim with 1 coat to match. Install new wall tile and tile cove base in one bathroom (on exterior wall side only) Install new painted wood base trim on all exterior walls where it was previously removed and new drywall is installed. Install new carpeting in living room, bedrooms, closets, and top stair landing The MEP scope of work for the Governor’s Mansion Penthouse Repairs includes the following: There will be a reuse of the existing Fan Coil Units of mechanical HVAC The HVAC, heating, cooling and ventilation is existing 2 ton console fan coil unit in the Living Room, existing 1 ton vertical floor fan coil unit in Bedroom #1 and existing 1 ton vertical floor fan coil unit in Bedroom #2. The fan coil units will be completely serviced, coils cleaned, condensate drain pan cleaned, condensate drains cleaned out, filters replaced, and thermostat controls checked. The exhaust fans will be replaced in both Shower Rooms with 100 cfm fans and new exhaust ductwork. New supply and return air grilles will be provided in both of the Bedrooms. The design of the electrical system will include new LED lighting in all spaces since the ceilings are being replaced. New ceiling fans are being provided in the Living Room and both Bedrooms to assist the HVAC system in comfort conditioning the spaces and help the HVAC system resolve humidity issues.

Job Purchase Information:

Free downloads are available by clicking “Order/Download” above. All downloads are typically available immediately in “My Downloads”. Download to your computer and print at any time. Full size hard copy sets are also available for a purchase and can be paid for by using a credit card online or your established Lynn account. Shipping, if required is additional based on the method selected.

Existing plan holders will be notified by email upon the release of any addenda and links will be available below for downloading/viewing.  Failure to order bid sets through Lynn Imaging and not being on the plan holders list will prevent you from receiving the notification and being able to view the addenda.

Addenda

  • 01/19/2022 - rfb-113-22 Addendum#1 emailed