Lynn Imaging Planroom

Logo

Verity Middle School Addition/Renovation

Order
 001
 CS1
Cover Sheet Volume 1
001-CS1_Cover_Sheet_Volume_1.tif
 002
 G0.1
Basement and First Floor Code Compliance
002-G0.1_Basement_and_First_Floor_Code_Compliance.tif
 003
 G0.2
Second and Third Floor Code Compliance
003-G0.2_Second_and_Third_Floor_Code_Compliance.tif
 004
 C-1
BMP Plan
004-C-1_BMP_Plan.tif
 005
 C-2
Site Survey
005-C-2_Site_Survey.tif
 006
 C-3
Demo Plan
006-C-3_Demo_Plan.tif
 007
 C-4
Staking Plan
007-C-4_Staking_Plan.tif
 008
 C-4A
Staking Plan Bid Alt
008-C-4A_Staking_Plan_Bid_Alt.tif
 009
 C-5
Grading Plan
009-C-5_Grading_Plan.tif
 010
 C-6
Utility Plan
010-C-6_Utility_Plan.tif
 011
 C-6A
Profiles
011-C-6A_Profiles.tif
 012
 C-6B
Landscape Plan
012-C-6B_Landscape_Plan.tif
 013
 C-7
Details Site
013-C-7_Details_Site.tif
 014
 C-8
Details Utilities
014-C-8_Details_Utilities.tif
 015
 C-9
Details Keystone Wall
015-C-9_Details_Keystone_Wall.tif
 016
 S0.1
Structural Notes
016-S0.1_Structural_Notes.tif
 017
 S0.2
Structural Notes
017-S0.2_Structural_Notes.tif
 018
 S0.3
Structural Quality Assurance Plan
018-S0.3_Structural_Quality_Assurance_Plan.tif
 019
 S0.4
Structural Quality Assurance Plan
019-S0.4_Structural_Quality_Assurance_Plan.tif
 020
 S1.1A
First Floor Slab Plan Area A
020-S1.1A_First_Floor_Slab_Plan_Area_A.tif
 021
 S1.1B
First Floor Slab Plan Area B
021-S1.1B_First_Floor_Slab_Plan_Area_B.tif
 022
 S1.1C
First Floor Slab Plan Area C
022-S1.1C_First_Floor_Slab_Plan_Area_C.tif
 023
 S1.2C
Mech Mezzanine Canopy Framing Plan Area C
023-S1.2C_Mech_Mezzanine_Canopy_Framing_Plan_Area_C.tif
 024
 S1.3A
Third Floor Framing PLan Area A
024-S1.3A_Third_Floor_Framing_PLan_Area_A.tif
 025
 S1.4A
Roof Framing Plan Area A
025-S1.4A_Roof_Framing_Plan_Area_A.tif
 026
 S1.4B
Roof Framing Plan Area B
026-S1.4B_Roof_Framing_Plan_Area_B.tif
 027
 S1.4C
Roof Framing Plan Area C
027-S1.4C_Roof_Framing_Plan_Area_C.tif
 028
 S1.5A
Alernate Plans Area A
028-S1.5A_Alernate_Plans_Area_A.tif
 029
 S1.5B
Alernate Plans Area B
029-S1.5B_Alernate_Plans_Area_B.tif
 030
 S2.1
Foundation Sections and Details
030-S2.1_Foundation_Sections_and_Details.tif
 031
 S2.2
Foundation Sections and Details
031-S2.2_Foundation_Sections_and_Details.tif
 032
 S2.3
Foundation Sections and Details
032-S2.3_Foundation_Sections_and_Details.tif
 033
 S3.1
Masonry Sections and Details
033-S3.1_Masonry_Sections_and_Details.tif
 034
 S3.2
Steel Column Schedule Sections and Details
034-S3.2_Steel_Column_Schedule_Sections_and_Details.tif
 035
 S4.1
Floor Framing Sections and Details
035-S4.1_Floor_Framing_Sections_and_Details.tif
 036
 S4.2
Partition Sections and Details
036-S4.2_Partition_Sections_and_Details.tif
 037
 S5.1
Roof Framing Sections and Details
037-S5.1_Roof_Framing_Sections_and_Details.tif
 038
 S5.2
Roof Framing Sections and Details
038-S5.2_Roof_Framing_Sections_and_Details.tif
 039
 S5.3
Roof Framing Sections and Details
039-S5.3_Roof_Framing_Sections_and_Details.tif
 040
 S5.4
Roof Framing Sections and Details
040-S5.4_Roof_Framing_Sections_and_Details.tif
 041
 S5.5
Roof Framing Sections and Details
041-S5.5_Roof_Framing_Sections_and_Details.tif
 042
 D1.0
Demo Basement Floor Plan
042-D1.0_Demo_Basement_Floor_Plan.tif
 043
 D1.1
Demo First Floor Plan
043-D1.1_Demo_First_Floor_Plan.tif
 044
 D1.2
Demo Second Floor Plan
044-D1.2_Demo_Second_Floor_Plan.tif
 045
 D1.3
Demo Third Floor Plan
045-D1.3_Demo_Third_Floor_Plan.tif
 046
 D1.4
Demo Roof Plan
046-D1.4_Demo_Roof_Plan.tif
 047
 D3.1
Demo Building Elevations
047-D3.1_Demo_Building_Elevations.tif
 048
 D3.2
Demo Building Elevations
048-D3.2_Demo_Building_Elevations.tif
 049
 A1.0
Basement Floor Plan
049-A1.0_Basement_Floor_Plan.tif
 050
 A1.1
First Floor Reference Plan
050-A1.1_First_Floor_Reference_Plan.tif
 051
 A1.1A
First Floor Plan Area A
051-A1.1A_First_Floor_Plan_Area_A.tif
 052
 A1.1B
First Floor Plan Area B
052-A1.1B_First_Floor_Plan_Area_B.tif
 053
 A1.1C
First Floor Plan Area C
053-A1.1C_First_Floor_Plan_Area_C.tif
 054
 A1.2
Second Floor Reference Plan
054-A1.2_Second_Floor_Reference_Plan.tif
 055
 A1.2A
Second Floor Plan Area A
055-A1.2A_Second_Floor_Plan_Area_A.tif
 056
 A1.2B
Second Floor Plan Area B
056-A1.2B_Second_Floor_Plan_Area_B.tif
 057
 A1.2C
Second Floor Plan Area C
057-A1.2C_Second_Floor_Plan_Area_C.tif
 058
 A1.3
Third Floor Reference Plan
058-A1.3_Third_Floor_Reference_Plan.tif
 059
 A1.3A
Third Floor Plan Area A
059-A1.3A_Third_Floor_Plan_Area_A.tif
 060
 A1.3B
Third Floor Plan Area B
060-A1.3B_Third_Floor_Plan_Area_B.tif
 061
 A1.4
Roof Plan
061-A1.4_Roof_Plan.tif
 062
 A1.5
Alternate3 Canopy Plan
062-A1.5_Alternate3_Canopy_Plan.tif
 063
 A2.1
Basement and First Floor Reflected Ceiling Plans
063-A2.1_Basement_and_First_Floor_Reflected_Ceiling_Plans.tif
 064
 A2.2
Second and Third Floor Reflected Ceiling Plans
064-A2.2_Second_and_Third_Floor_Reflected_Ceiling_Plans.tif
 065
 A3.1
Building Elevations
065-A3.1_Building_Elevations.tif
 066
 A3.2
Building Elevations
066-A3.2_Building_Elevations.tif
 067
 A4.1
Overall Gym Building Sections
067-A4.1_Overall_Gym_Building_Sections.tif
 068
 A4.2
Enlarged Partial Building Sections
068-A4.2_Enlarged_Partial_Building_Sections.tif
 069
 A4.3
Enlarged Partial Building Sections
069-A4.3_Enlarged_Partial_Building_Sections.tif
 070
 A4.4
Enlarged Partial Building Sections
070-A4.4_Enlarged_Partial_Building_Sections.tif
 071
 A5.1
Wall Sections
071-A5.1_Wall_Sections.tif
 072
 A5.2
Wall Sections
072-A5.2_Wall_Sections.tif
 073
 A5.3
Wall Sections
073-A5.3_Wall_Sections.tif
 074
 A5.4
Wall Sections
074-A5.4_Wall_Sections.tif
 075
 A5.5
Wall Sections
075-A5.5_Wall_Sections.tif
 076
 A5.6
Wall Sections
076-A5.6_Wall_Sections.tif
 077
 A5.7
Wall Sections
077-A5.7_Wall_Sections.tif
 078
 A5.8
Wall Sections
078-A5.8_Wall_Sections.tif
 079
 A5.9
Wall Sections
079-A5.9_Wall_Sections.tif
 080
 A6.1
Stair Sections and Details
080-A6.1_Stair_Sections_and_Details.tif
 081
 A6.2
Roof Details
081-A6.2_Roof_Details.tif
 082
 A6.3
Roof and Plan Details
082-A6.3_Roof_and_Plan_Details.tif
 083
 A7.0
Door Frame Elevations and Schedule
083-A7.0_Door_Frame_Elevations_and_Schedule.tif
 084
 A7.1
Door Schedule and Window Frame Elevations
084-A7.1_Door_Schedule_and_Window_Frame_Elevations.tif
 085
 A7.2
Head Jamb and Sill Details
085-A7.2_Head_Jamb_and_Sill_Details.tif
 086
 A8.1
Basement and First Floor Room Finish Schedules
086-A8.1_Basement_and_First_Floor_Room_Finish_Schedules.tif
 087
 A8.2
Second and Third Floor Room Finish Schedules
087-A8.2_Second_and_Third_Floor_Room_Finish_Schedules.tif
 088
 A8.3
Enalrged Bank and Chorus Rooms
088-A8.3_Enalrged_Bank_and_Chorus_Rooms.tif
 089
 A8.4
Enlarged FMB and Industrial Technology Classrooms
089-A8.4_Enlarged_FMB_and_Industrial_Technology_Classrooms.tif
 090
 A8.5
Enlarged Science Classrooms
090-A8.5_Enlarged_Science_Classrooms.tif
 091
 A8.6
Enlarged Art Computer and Typical Classrooms
091-A8.6_Enlarged_Art_Computer_and_Typical_Classrooms.tif
 092
 A8.7
Enlarged Family and Consumer Science
092-A8.7_Enlarged_Family_and_Consumer_Science.tif
 093
 A8.8
Enlarged Media Center
093-A8.8_Enlarged_Media_Center.tif
 094
 A8.9
Enlarged Locker Rooms
094-A8.9_Enlarged_Locker_Rooms.tif
 095
 A8.10
Enlarged Restrooms
095-A8.10_Enlarged_Restrooms.tif
 096
 FS1.0
Kitchen Equipment Floor Plan
096-FS1.0_Kitchen_Equipment_Floor_Plan.tif
 097
 FS1.1
Kitchen Schedule and Details
097-FS1.1_Kitchen_Schedule_and_Details.tif
 098
 FS1.2
Kitchen Sections and Elevations
098-FS1.2_Kitchen_Sections_and_Elevations.tif
 099
 FS1.3
Kitchen Hood Drawings
099-FS1.3_Kitchen_Hood_Drawings.tif
 100
 FS1.4
Kitchen Hood Drawings
100-FS1.4_Kitchen_Hood_Drawings.tif
 101
 CS2
Cover Sheet Volume 2
101-CS2_Cover_Sheet_Volume_2.tif
 102
 UE1.0
Electrical Site Utilities Demo Plan
102-UE1.0_Electrical_Site_Utilities_Demo_Plan.tif
 103
 UE2.0
Electrical Site Utilities New Work Plan
103-UE2.0_Electrical_Site_Utilities_New_Work_Plan.tif
 104
 UE3.0
Electrical Site Details
104-UE3.0_Electrical_Site_Details.tif
 105
 UM1.0
Mechanical Site Utilities Demo Plan
105-UM1.0_Mechanical_Site_Utilities_Demo_Plan.tif
 106
 UM2.0
Mechanical Site Utilities New Work Plan
106-UM2.0_Mechanical_Site_Utilities_New_Work_Plan.tif
 107
 UM3.0
Mechanical Site Utilities Details
107-UM3.0_Mechanical_Site_Utilities_Details.tif
 108
 FP1.0
Basement and First Floor Fire Protection Demo Plan
108-FP1.0_Basement_and_First_Floor_Fire_Protection_Demo_Plan.tif
 109
 FP1.1
Second and Third Floor Fire Protection Demo Plan
109-FP1.1_Second_and_Third_Floor_Fire_Protection_Demo_Plan.tif
 110
 FP2.0
Basement Fire Protection Plan
110-FP2.0_Basement_Fire_Protection_Plan.tif
 111
 FP2.1
First Floor Fire Protection Plan
111-FP2.1_First_Floor_Fire_Protection_Plan.tif
 112
 FP2.2
Second Floor Fire Protection Plan
112-FP2.2_Second_Floor_Fire_Protection_Plan.tif
 113
 FP2.3
Third Floor Fire Protection Plan
113-FP2.3_Third_Floor_Fire_Protection_Plan.tif
 114
 P1.0
Plumbing Legend
114-P1.0_Plumbing_Legend.tif
 115
 P2.0
Basement Plumbing Demo
115-P2.0_Basement_Plumbing_Demo.tif
 116
 P2.1
First Floor Plumbing Demo
116-P2.1_First_Floor_Plumbing_Demo.tif
 117
 P2.2
Second Floor Plumbing Demo
117-P2.2_Second_Floor_Plumbing_Demo.tif
 118
 P2.3
Third Floor Plumbing Demo
118-P2.3_Third_Floor_Plumbing_Demo.tif
 119
 P3.0
Basement Plumbing Plan
119-P3.0_Basement_Plumbing_Plan.tif
 120
 P3.1A
First Floor Plumbing Plan Area A
120-P3.1A_First_Floor_Plumbing_Plan_Area_A.tif
 121
 P3.1B
First Floor Plumbing Plan Area B
121-P3.1B_First_Floor_Plumbing_Plan_Area_B.tif
 122
 P3.1C
First Floor Plumbing Plan Area C
122-P3.1C_First_Floor_Plumbing_Plan_Area_C.tif
 123
 P3.2A
Second Floor Plumbing Plan Area A
123-P3.2A_Second_Floor_Plumbing_Plan_Area_A.tif
 124
 P3.2C
Second Floor Plumbing Plan Area C
124-P3.2C_Second_Floor_Plumbing_Plan_Area_C.tif
 125
 P3.3A
Third Floor Plumbing Plan Area A
125-P3.3A_Third_Floor_Plumbing_Plan_Area_A.tif
 126
 P4.0
Enlarged Kitchen Plumbing Plan
126-P4.0_Enlarged_Kitchen_Plumbing_Plan.tif
 127
 P5.0
Plumbing Schedules
127-P5.0_Plumbing_Schedules.tif
 128
 P5.1
Plumbing Schedules and Details
128-P5.1_Plumbing_Schedules_and_Details.tif
 129
 P6.0
Plumbing Risers
129-P6.0_Plumbing_Risers.tif
 130
 P6.1
Plumbing Risers
130-P6.1_Plumbing_Risers.tif
 131
 P6.2
Plumbing Risers
131-P6.2_Plumbing_Risers.tif
 132
 P6.3
Plumbing Risers
132-P6.3_Plumbing_Risers.tif
 133
 M1.0
Mechanical Legend
133-M1.0_Mechanical_Legend.tif
 134
 M2.0
Basement Demo Plan
134-M2.0_Basement_Demo_Plan.tif
 135
 M2.1A
First Floor Demo Plan Area A
135-M2.1A_First_Floor_Demo_Plan_Area_A.tif
 136
 M2.1B
First Floor Demo Plan Area B
136-M2.1B_First_Floor_Demo_Plan_Area_B.tif
 137
 M2.1C
First Floor Demo Plan Area C
137-M2.1C_First_Floor_Demo_Plan_Area_C.tif
 138
 M2.2A
Second Floor Demo Plan Area A
138-M2.2A_Second_Floor_Demo_Plan_Area_A.tif
 139
 M2.2B
Second Floor Demo Plan Area B
139-M2.2B_Second_Floor_Demo_Plan_Area_B.tif
 140
 M2.3A
Third Floor Demo Plan Area A
140-M2.3A_Third_Floor_Demo_Plan_Area_A.tif
 141
 M2.3B
Third Floor Demo Plan Area B
141-M2.3B_Third_Floor_Demo_Plan_Area_B.tif
 142
 M2.4
Existing Roof PLan
142-M2.4_Existing_Roof_PLan.tif
 143
 M3.0
New Work Basement Floor Plan
143-M3.0_New_Work_Basement_Floor_Plan.tif
 144
 M3.1A
New Work First Floor Plan Area A
144-M3.1A_New_Work_First_Floor_Plan_Area_A.tif
 145
 M3.1B
New Work First Floor Plan Area B
145-M3.1B_New_Work_First_Floor_Plan_Area_B.tif
 146
 M3.1C
New Work First Floor Plan Area C
146-M3.1C_New_Work_First_Floor_Plan_Area_C.tif
 147
 M3.2A
New Work Second Floor Plan Area A
147-M3.2A_New_Work_Second_Floor_Plan_Area_A.tif
 148
 M3.2B
New Work Second Floor Plan Area B
148-M3.2B_New_Work_Second_Floor_Plan_Area_B.tif
 149
 M3.2C
New Work Second Floor Plan Area C
149-M3.2C_New_Work_Second_Floor_Plan_Area_C.tif
 150
 M3.3A
New Work Third Floor Plan Area A
150-M3.3A_New_Work_Third_Floor_Plan_Area_A.tif
 151
 M3.3B
New Work Third Floor Plan Area B
151-M3.3B_New_Work_Third_Floor_Plan_Area_B.tif
 152
 M3.4
New Work Roof Plan
152-M3.4_New_Work_Roof_Plan.tif
 153
 M4.0
New Work Basement Floor Plan
153-M4.0_New_Work_Basement_Floor_Plan.tif
 154
 M4.1A
New Work First Floor Plan Area A
154-M4.1A_New_Work_First_Floor_Plan_Area_A.tif
 155
 M4.1B
New Work First Floor Plan Area B
155-M4.1B_New_Work_First_Floor_Plan_Area_B.tif
 156
 M4.1C
New Work First Floor Plan Area C
156-M4.1C_New_Work_First_Floor_Plan_Area_C.tif
 157
 M4.2A
New Work Second Floor Plan Area A
157-M4.2A_New_Work_Second_Floor_Plan_Area_A.tif
 158
 M4.2B
New Work Second Floor Plan Area B
158-M4.2B_New_Work_Second_Floor_Plan_Area_B.tif
 159
 M4.2C
New Work Second Floor Plan Area C
159-M4.2C_New_Work_Second_Floor_Plan_Area_C.tif
 160
 M4.3A
New Work Third Floor Plan Area A
160-M4.3A_New_Work_Third_Floor_Plan_Area_A.tif
 161
 M4.3B
New Work Third Floor Plan Area B
161-M4.3B_New_Work_Third_Floor_Plan_Area_B.tif
 162
 M5.0
Mechanical Details
162-M5.0_Mechanical_Details.tif
 163
 M6.0
Mechanical Details
163-M6.0_Mechanical_Details.tif
 164
 M6.1
VRF Schematics
164-M6.1_VRF_Schematics.tif
 165
 M6.2
VRF Schematics
165-M6.2_VRF_Schematics.tif
 166
 M6.3
VRF Schematics
166-M6.3_VRF_Schematics.tif
 167
 M7.0
Mechanical Details
167-M7.0_Mechanical_Details.tif
 168
 M8.0
Mechanical Schedules
168-M8.0_Mechanical_Schedules.tif
 169
 M8.1
Mechanical Schedules
169-M8.1_Mechanical_Schedules.tif
 170
 E1.0
Electrical Legend
170-E1.0_Electrical_Legend.tif
 171
 E2.0
Demo Basement Plans
171-E2.0_Demo_Basement_Plans.tif
 172
 E2.1A
Demo First Floor Plan Area A
172-E2.1A_Demo_First_Floor_Plan_Area_A.tif
 173
 E2.1B
Demo First Floor Plan Area B
173-E2.1B_Demo_First_Floor_Plan_Area_B.tif
 174
 E2.1C
Demo First Floor Plan Area C
174-E2.1C_Demo_First_Floor_Plan_Area_C.tif
 175
 E2.2A
Demo Second Floor Plan Area A
175-E2.2A_Demo_Second_Floor_Plan_Area_A.tif
 176
 E2.2B
Demo Second Floor Plan Area B
176-E2.2B_Demo_Second_Floor_Plan_Area_B.tif
 177
 E2.3A
Demo Third Floor Plan Area A
177-E2.3A_Demo_Third_Floor_Plan_Area_A.tif
 178
 E2.3B
Demo Third Floor Plan Area B
178-E2.3B_Demo_Third_Floor_Plan_Area_B.tif
 179
 E2.4
Demo Roof Plan
179-E2.4_Demo_Roof_Plan.tif
 180
 E3.0
New Work Basement LIghting Plan
180-E3.0_New_Work_Basement_LIghting_Plan.tif
 181
 E3.1A
New Work First Floor Lighting Plan Area A
181-E3.1A_New_Work_First_Floor_Lighting_Plan_Area_A.tif
 182
 E3.1B
New Work First Floor Lighting Plan Area B
182-E3.1B_New_Work_First_Floor_Lighting_Plan_Area_B.tif
 183
 E3.1C
New Work First Floor Lighting Plan Area C
183-E3.1C_New_Work_First_Floor_Lighting_Plan_Area_C.tif
 184
 E3.2A
New Work Second Floor Lighting Plan Area A
184-E3.2A_New_Work_Second_Floor_Lighting_Plan_Area_A.tif
 185
 E3.2B
New Work Second Floor Lighting Plan Area B
185-E3.2B_New_Work_Second_Floor_Lighting_Plan_Area_B.tif
 186
 E3.2C
New Work Second Floor Lighting Plan Area C
186-E3.2C_New_Work_Second_Floor_Lighting_Plan_Area_C.tif
 187
 E3.3A
New Work Third Floor Lighting Plan Area A
187-E3.3A_New_Work_Third_Floor_Lighting_Plan_Area_A.tif
 188
 E3.3B
New Work Third Floor Lighting Plan Area B
188-E3.3B_New_Work_Third_Floor_Lighting_Plan_Area_B.tif
 189
 E4.0
New Work Basement Power Plan
189-E4.0_New_Work_Basement_Power_Plan.tif
 190
 E4.1A
New Work First Floor Power Plan Area A
190-E4.1A_New_Work_First_Floor_Power_Plan_Area_A.tif
 191
 E4.1B
New Work First Floor Power Plan Area B
191-E4.1B_New_Work_First_Floor_Power_Plan_Area_B.tif
 192
 E4.1C
New Work First Floor Power Plan Area C
192-E4.1C_New_Work_First_Floor_Power_Plan_Area_C.tif
 193
 E4.2A
New Work Second Floor Power Plan Area A
193-E4.2A_New_Work_Second_Floor_Power_Plan_Area_A.tif
 194
 E4.2B
New Work Second Floor Power Plan Area B
194-E4.2B_New_Work_Second_Floor_Power_Plan_Area_B.tif
 195
 E4.2C
New Work Second Floor Power Plan Area C
195-E4.2C_New_Work_Second_Floor_Power_Plan_Area_C.tif
 196
 E4.3A
New Work Third Floor Power Plan Area A
196-E4.3A_New_Work_Third_Floor_Power_Plan_Area_A.tif
 197
 E4.3B
New Work Third Floor Power Plan Area B
197-E4.3B_New_Work_Third_Floor_Power_Plan_Area_B.tif
 198
 E5.0
New Work Basement HVAC Power Plan
198-E5.0_New_Work_Basement_HVAC_Power_Plan.tif
 199
 E5.1A
New Work First Floor HVAC Power Plan Area A
199-E5.1A_New_Work_First_Floor_HVAC_Power_Plan_Area_A.tif
 200
 E5.1B
New Work First Floor HVAC Power Plan Area B
200-E5.1B_New_Work_First_Floor_HVAC_Power_Plan_Area_B.tif
 201
 E5.1C
New Work First Floor HVAC Power Plan Area C
201-E5.1C_New_Work_First_Floor_HVAC_Power_Plan_Area_C.tif
 202
 E5.2A
New Work Second Floor HVAC Power Plan Area A
202-E5.2A_New_Work_Second_Floor_HVAC_Power_Plan_Area_A.tif
 203
 E5.2B
New Work Second Floor HVAC Power Plan Area B
203-E5.2B_New_Work_Second_Floor_HVAC_Power_Plan_Area_B.tif
 204
 E5.2C
New Work Second Floor HVAC Power Plan Area C
204-E5.2C_New_Work_Second_Floor_HVAC_Power_Plan_Area_C.tif
 205
 E5.3A
New Work Third Floor HVAC Power Plan Area A
205-E5.3A_New_Work_Third_Floor_HVAC_Power_Plan_Area_A.tif
 206
 E5.3B
New Work Third Floor HVAC Power Plan Area B
206-E5.3B_New_Work_Third_Floor_HVAC_Power_Plan_Area_B.tif
 207
 E5.4
New Work Roof HVAC Power Plan
207-E5.4_New_Work_Roof_HVAC_Power_Plan.tif
 208
 E6.0
New Work Basement Systems Plan
208-E6.0_New_Work_Basement_Systems_Plan.tif
 209
 E6.1A
New Work First Floor Systems Plan Area A
209-E6.1A_New_Work_First_Floor_Systems_Plan_Area_A.tif
 210
 E6.1B
New Work First Floor Systems Plan Area B
210-E6.1B_New_Work_First_Floor_Systems_Plan_Area_B.tif
 211
 E6.1C
New Work First Floor Systems Plan Area C
211-E6.1C_New_Work_First_Floor_Systems_Plan_Area_C.tif
 212
 E6.2A
New Work Second Floor Systems Plan Area A
212-E6.2A_New_Work_Second_Floor_Systems_Plan_Area_A.tif
 213
 E6.2B
New Work Second Floor Systems Plan Area B
213-E6.2B_New_Work_Second_Floor_Systems_Plan_Area_B.tif
 214
 E6.2C
New Work Second Floor Systems Plan Area C
214-E6.2C_New_Work_Second_Floor_Systems_Plan_Area_C.tif
 215
 E6.3A
New Work Third Floor Systems Plan Area A
215-E6.3A_New_Work_Third_Floor_Systems_Plan_Area_A.tif
 216
 E6.3B
New Work Third Floor Systems Plan Area B
216-E6.3B_New_Work_Third_Floor_Systems_Plan_Area_B.tif
 217
 E7.0
New Work Enlarged Power Plan Area A
217-E7.0_New_Work_Enlarged_Power_Plan_Area_A.tif
 218
 E8.0
Electrical Details
218-E8.0_Electrical_Details.tif
 219
 E8.1
Electrical Details
219-E8.1_Electrical_Details.tif
 220
 E8.2
Electrical Details
220-E8.2_Electrical_Details.tif
 221
 E8.3
Electrical Details
221-E8.3_Electrical_Details.tif
 222
 E8.4
Electrical Details
222-E8.4_Electrical_Details.tif
 223
 E9.0
Electrical Riser Diagram
223-E9.0_Electrical_Riser_Diagram.tif
 224
 E9.1
Communications Riser Diagram
224-E9.1_Communications_Riser_Diagram.tif
 225
 E9.2
Communications Riser Diagram
225-E9.2_Communications_Riser_Diagram.tif
 226
 E9.3
Communications Riser Diagram
226-E9.3_Communications_Riser_Diagram.tif
 227
 E9.4
Communications Riser Diagram
227-E9.4_Communications_Riser_Diagram.tif
 228
 E10.0
Electrical Schedules
228-E10.0_Electrical_Schedules.tif
 229
 E10.1
Electrical Schedules
229-E10.1_Electrical_Schedules.tif
 230
 E10.2
Electrical Schedules
230-E10.2_Electrical_Schedules.tif
 231
 E10.3
Electrical Schedules
231-E10.3_Electrical_Schedules.tif
 232
 E10.4
Electrical Schedules
232-E10.4_Electrical_Schedules.tif
 233
 E10.5
Electrical Schedules
233-E10.5_Electrical_Schedules.tif
 234
 E10.6
Electrical Schedules
234-E10.6_Electrical_Schedules.tif