Pre-Bid Information
05/09/2013 10:00 AM
A mandatory pre-Bid conference will be held at 10:00 a.m. local time on May 9, 2011at the Radcliff WWTP. A site visit will follow the conference.
Description
Remove three existing gate valves, valve boxes, extension stems, floor stands and associated piping, as shown on the drawings. Furnish and install three resilient seat gate valves and associated piping. Furnish and install three 5' diameter precast concrete valve vaults complete with base, top slab, casting, floor stand and extension stems. Backfill excavation with crushed stone and restore asphalt surface in accordance with the contract documents.
Demolish the metal and wood rake facilities in two unused basins of the digester structure.