Lynn Imaging Planroom

Logo

Jessie Clark Middle School Addition and Renovation

Order

Jessie Clark Middle School Addition and Renovation

Contact

Company Contact

Tate Hill Jacobs Architects
Susan Hill
Location

Location

Lexington, KY

Pre-Bid Information

Pre-Bid Information

04/24/2013 04:30 PM ET
Mandatory Pre-Bid for General Contractors
Project Site
Bid Information

Bid Information

05/15/2013 02:00 PM ET
FCPS Department of Physical Support Services Conference Room
400 Springhill Dr
Lexington, KY

Description

Description

Please Note The Pre-Bid Time has changed to 4:30 PM

The work includes the completion renovation of the existing school with new 2-story Addition for a total of 124,966 SF. The existing school has approximately 99,371 SF and the 2-story Addition will have 25,595 SF. Jessie Clark Middle School was originally built in 1962 with major building additions in 1990. The scope of work for this current major construction project includes but is not limited to: selective and building demolition, removal and replacement of mechanical systems including installation of variable refrigerant volume systems, replacement of existing electrical systems, fire protection, fire alarm systems, interior finishes (walls, ceilings, floors and base), door hardware, site improvements and paving, replacement of kitchen equipment and the additional 25,595 SF of new administrative area, interior corridor connection to gym, music & art department, enrichment classrooms, elevator and secondary entry vestibules. The Owner shall be responsible for all asbestos abatement with the exception that existing roofing system components containing asbestos shall be removed by the contractor. The work effort will be executed in three Phases beginning in July 2013 and ending July 2015. The building will be occupied and in-use during all phases of construction work. The site work is designed to interface with LFUCG road and utility work along Clays Mill Road while allowing the school to continue its primary functions during the regular academic calendar years of 2013-14 and 2014-15. The contractor shall be required to coordinate the contract work with daily school activities, as well as between phases with the FCPS-provided activities related to: moving of occupants; asbestos abatement; and the installation of casework (not-in-contract).

Job Purchase Information:

A complete set of Plans and Specifications is available for a non-refundable purchase of $400.00, payable to Lynn Imaging.

A CD of the plans and specifications is available for a non-refundable purchase price of $150.00.

There will be a $35.00 shipping charge for each set shipped UPS Ground. There will be a $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS). Please note we only ship Fed-Ex on a customer's shipper number and that delivery surcharges are subject to change.

Mail checks to Lynn Imaging, Attn: Distribution, 328 Old Vine Street, Lexington KY 40507.

Addenda

  • 04/24/2013 - Jessie Clark MS Add01 04-24-13 Email 04-24-13
  • 04/25/2013 - Jessie Clark MS Add02 04-25-13 Email 04-25-13
  • 05/01/2013 - Jessie Clark MS Add03 05.01.13 email 05.01.13
  • 05/08/2013 - Jessie Clark MS Add04 05-08-13 Email 05-08-13
  • 05/08/2013 - Jessie Clark MS Add05 05-08-13 Email 05-08-13
  • 05/09/2013 - Jessie Clark MS Add06 05-09-13 Email 05-09-13
  • 05/10/2013 - Jessie Clark MS Clarification 01 05-10-13 Email 05-10-13
  • 05/13/2013 - Jessie Clark MS Clarification 02 05-13-13 Email 05-13-13