Pre-Bid Information
01/10/2013 02:30 PM
General Contract Bidder Attendance is Mandatory
Description
The Base Bid Work includes partial replacement of the major roofing components of the existing Berea Community School and interior architectural finish work to accommodate this work, with three Bid Alternates. The scope of work for this project include Base Bid Work to replace the existing loose laid, graveled ballasted membrane system on a portion of the low slope roofing area with a new 2-ply modified bitumen system with new insulation, selected interior demolition and new interior finish work in order to accommodate the roofing replacement. Bid Alternates include (1) replacement of the existing Elementary Pod HVAC system with a new geothermal water source heat pump system to include a new wheel and plate energy recovery system, and replacement of existing parking lot pavement surface at new geothermal well field, (2) a new controls system for the existing lighting fixtures in the Elementary Pod, and (3) additional spray-on cellulose thermal insulation at the partial building perimeter.