Lynn Imaging Planroom

Logo

Southside Elementary School

Order
 001
 A000-Cover
Sheet
001-A000-Cover_Sheet.tif
 002
 C100
Boundary And Topographic Survey
002-C100_Boundary_And_Topographic_Survey.tif
 003
 C201
Site Demolition
003-C201_Site_Demolition.tif
 004
 C202
Site Demolition
004-C202_Site_Demolition.tif
 005
 C300
Site Layout
005-C300_Site_Layout.tif
 006
 C301
Paving And Striping
006-C301_Paving_And_Striping.tif
 007
 C302
Control Joints
007-C302_Control_Joints.tif
 008
 C400
Site Grading
008-C400_Site_Grading.tif
 009
 C400a
Grading Detail Around Building
009-C400a_Grading_Detail_Around_Building.tif
 010
 C501
Acess Road Sta 1000 2400
010-C501_Acess_Road_Sta_1000_2400.tif
 011
 C501a
Access Road Detail At Ky Street
011-C501a_Access_Road_Detail_At_Ky_Street.tif
 012
 C502
Access Road Sta 2400 3800
012-C502_Access_Road_Sta_2400_3800.tif
 013
 C503
Access Road Sta 3800 5205
013-C503_Access_Road_Sta_3800_5205.tif
 014
 C600
Site Utilities
014-C600_Site_Utilities.tif
 015
 C701
Storm And SWPP Plan
015-C701_Storm_And_SWPP_Plan.tif
 016
 C702
Erosion Control Notes
016-C702_Erosion_Control_Notes.tif
 017
 C800
Composite Drainage Plan
017-C800_Composite_Drainage_Plan.tif
 018
 C901
Details
018-C901_Details.tif
 019
 C902
Details
019-C902_Details.tif
 020
 C201A
Clearing And Tree Preservation Plan
020-C201A_Clearing_And_Tree_Preservation_Plan.tif
 021
 L101
Landscape Plan
021-L101_Landscape_Plan.tif
 022
 L102
Landscape Plan Enlargement
022-L102_Landscape_Plan_Enlargement.tif
 023
 L103
Landscape Details
023-L103_Landscape_Details.tif
 024
 L104
Playground A Plan
024-L104_Playground_A_Plan.tif
 025
 L105
Playground B Plan
025-L105_Playground_B_Plan.tif
 026
 LS001
Life Safety Plans
026-LS001_Life_Safety_Plans.tif
 027
 D101c
Demolition Plan Part C
027-D101c_Demolition_Plan_Part_C.tif
 028
 A001
Wall Types And Typical Details
028-A001_Wall_Types_And_Typical_Details.tif
 029
 A002
Window And Frame Types
029-A002_Window_And_Frame_Types.tif
 030
 A003
Door And Window Details
030-A003_Door_And_Window_Details.tif
 031
 A005
Door Schedule
031-A005_Door_Schedule.tif
 032
 A006
Room Finish Schedule
032-A006_Room_Finish_Schedule.tif
 033
 A007
Finish Plan
033-A007_Finish_Plan.tif
 034
 A008
Finish Plan
034-A008_Finish_Plan.tif
 035
 A100
Site Plan
035-A100_Site_Plan.tif
 036
 A101a
Lower Floor Plan Area A
036-A101a_Lower_Floor_Plan__Area_A.tif
 037
 A101b
Lower Floor Plan Area B
037-A101b_Lower_Floor_Plan_Area_B.tif
 038
 A102a
Upper Floor Plan Area A
038-A102a_Upper_Floor_Plan_Area_A.tif
 039
 A102b
Upper Floor Plan Area B
039-A102b_Upper_Floor_Plan_Area_B.tif
 040
 A102c
Upper Floor Plan Area C
040-A102c_Upper_Floor_Plan_Area_C.tif
 041
 A103
Mechanical Platform Plan
041-A103_Mechanical_Platform_Plan.tif
 042
 A104
Roof Plan
042-A104_Roof_Plan.tif
 043
 A201
Elevations
043-A201_Elevations.tif
 044
 A202
Elevations
044-A202_Elevations.tif
 045
 A203
Elevations
045-A203_Elevations.tif
 046
 A204
Building Sections
046-A204_Building_Sections.tif
 047
 A205
Building Sections
047-A205_Building_Sections.tif
 048
 A301
Enlarged Restroom Plans And Elevations
048-A301_Enlarged_Restroom_Plans_And_Elevations.tif
 049
 A302
Enlarged Classroom Plans And Elevations
049-A302_Enlarged_Classroom_Plans_And_Elevations.tif
 050
 A303
Enlarged Classroom Plans And Elevations
050-A303_Enlarged_Classroom_Plans_And_Elevations.tif
 051
 A304
Enlarged Classroom Plans And Elevations
051-A304_Enlarged_Classroom_Plans_And_Elevations.tif
 052
 A305
Enlarged Classroom Plans And Elevations
052-A305_Enlarged_Classroom_Plans_And_Elevations.tif
 053
 A306
Enlarged Kitchen Plan And Details
053-A306_Enlarged_Kitchen_Plan_And_Details.tif
 054
 A307
Enlarged Media Center Plan And Details
054-A307_Enlarged_Media_Center_Plan_And_Details.tif
 055
 A308
Interior Elevations Lobby Cafeteria
055-A308_Interior_Elevations_Lobby_Cafeteria.tif
 056
 A309
Interior Elevations Media Center Cafe
056-A309_Interior_Elevations_Media_Center_Cafe.tif
 057
 A310
Interior Elevations Gym
057-A310_Interior_Elevations_Gym.tif
 058
 A311
Interior Elevations Gym
058-A311_Interior_Elevations_Gym.tif
 059
 A312
Enlarged Plans
059-A312_Enlarged_Plans.tif
 060
 A401a
Reflected Ceiling Plan Lower Area A
060-A401a_Reflected_Ceiling_Plan_Lower_Area_A.tif
 061
 A401b
Reflected Ceiling Plan Lower Area B
061-A401b_Reflected_Ceiling_Plan_Lower_Area_B.tif
 062
 A402a
Reflected Ceiling Plan Upper Area A
062-A402a_Reflected_Ceiling_Plan_Upper_Area_A.tif
 063
 A402b
Reflected Ceiling Plan Upper Area B
063-A402b_Reflected_Ceiling_Plan_Upper_Area_B.tif
 064
 A402c
Reflected Ceiling Plan Upper Area C
064-A402c_Reflected_Ceiling_Plan_Upper_Area_C.tif
 065
 A501
Stair And Elevator Plans
065-A501_Stair_And_Elevator_Plans.tif
 066
 A502
Stair And Elevator Sections And Details
066-A502_Stair_And_Elevator_Sections_And_Details.tif
 067
 A601
Wall Sections
067-A601_Wall_Sections.tif
 068
 A602
Wall Sections
068-A602_Wall_Sections.tif
 069
 A603
Wall Sections
069-A603_Wall_Sections.tif
 070
 A604
Wall Sections
070-A604_Wall_Sections.tif
 071
 A605
Wall Sections
071-A605_Wall_Sections.tif
 072
 A606
Wall Sections
072-A606_Wall_Sections.tif
 073
 A607
Wall Sections
073-A607_Wall_Sections.tif
 074
 A608
Section Details
074-A608_Section_Details.tif
 075
 A701
Plan Details
075-A701_Plan_Details.tif
 076
 A702
Plan Details
076-A702_Plan_Details.tif
 077
 S001
STRUCTRUAL NOTES
076-S001_STRUCTRUAL_NOTES.tif
 078
 S002
STRUCTURAL QUALITY ASSURANCE PLAN
078_S002_STRUCTURAL_QUALITY_ASSURANCE_PLAN.tif
 079
 S101A
FOUNDATION SLAB PLAN AREA A
079-S101A_FOUNDATION_SLAB_PLAN_AREA_A.tif
 080
 S101B
FOUNDATION SLAB PLAN AREA B
080-S101B_FOUNDATION_SLAB_PLAN_AREA_B.tif
 081
 S102A
UPPER FLOOR FRAMING PLAN AREA A
081-S102A_UPPER_FLOOR_FRAMING_PLAN_AREA_A.tif
 082
 S102B
UPPER FLOOR FRAMING PLAN AREA B
082-S102B_UPPER_FLOOR_FRAMING_PLAN_AREA_B.tif
 083
 S102C
UPPER FLOOR FOUNDATION SLAB PLAN AREA C ALTERNATE
083-S102C_UPPER_FLOOR_FOUNDATION_SLAB_PLAN_AREA_C_ALTERNATE.tif
 084
 S103
MECHANICAL PLATFORM FRAMING PLAN
084-S103_MECHANICAL_PLATFORM_FRAMING_PLAN.tif
 085
 S104A
ROOF FRAMING PLAN AREA A
085-S104A_ROOF_FRAMING_PLAN_AREA_A.tif
 086
 104B
ROOF FRAMING PLAN AREA-B
086S-104B_ROOF_FRAMING_PLAN_AREA-B.tif
 087
 S104C
ROOF FRAMING PLAN AREA C ALTERNATE
087-S104C_ROOF_FRAMING_PLAN_AREA_C_ALTERNATE.tif
 088
 S105
CANOPY FOUNDATION PLAN
088-S105_CANOPY_FOUNDATION_PLAN.tif
 089
 S106
CANOPY ROOF FRAMING PLAN
089-S106_CANOPY_ROOF_FRAMING_PLAN.tif
 090
 S201
FOUNDATION SECTIONS AND DETAILS
090-S201_FOUNDATION_SECTIONS_AND_DETAILS.tif
 091
 S202
FOUNDATION SECTIONS AND DETAILS
091-S202_FOUNDATION_SECTIONS_AND_DETAILS.tif
 092
 S203
FOUNDATION SECTIONS AND DETAILS
092-S203_FOUNDATION_SECTIONS_AND_DETAILS.tif
 093
 S301
MASONRY ICF TYPICAL DETAILS
093-S301_MASONRY_ICF_TYPICAL_DETAILS.tif
 094
 S302
COLUMN SCHEDULE AND DETAILS
094-S302_COLUMN_SCHEDULE_AND_DETAILS.tif
 095
 S401
FLOOR FRAMING SECTIONS AND DETAILS
095-S401_FLOOR_FRAMING_SECTIONS_AND_DETAILS.tif
 096
 S402
FLOOR FRAMING SECTIONS AND DETAILS
096-S402_FLOOR_FRAMING_SECTIONS_AND_DETAILS.tif
 097
 S501
ROOF FRAMING SECTIONS AND DETAILS
097-S501_ROOF_FRAMING_SECTIONS_AND_DETAILS.tif
 098
 S502
ROOF FRAMING SECTIONS AND DETAILS
098-S502_ROOF_FRAMING_SECTIONS_AND_DETAILS.tif
 001
 A001
COVER SHEET
001-A001_COVER_SHEET.tif
 002
 UM100
GEOTHERMAL DETAILS AND GENERAL NOTES
002-UM100_GEOTHERMAL_DETAILS_AND_GENERAL_NOTES.tif
 003
 UM101
SITE PLAN MECHANICAL
003-UM101_SITE_PLAN_MECHANICAL.tif
 004
 M100
MECHANICAL LEGEND AND GENERAL NOTES
004-M100_MECHANICAL_LEGEND_AND_GENERAL_NOTES.tif
 005
 M101
UPPER LEVEL AREA C MECHANICAL DEMOILITION
005-M101_UPPER_LEVEL_AREA_C_MECHANICAL_DEMOILITION.tif
 006
 M201A
LOWER LEVEL FLOOR PLAN AREA A AIR DISTRIBUTION
006-M201A_LOWER_LEVEL_FLOOR_PLAN_AREA_A_AIR_DISTRIBUTION.tif
 007
 M201B
LOWER LEVEL FLOOR PLAN AREA B AIR DISTRIBUTION
007-M201B_LOWER_LEVEL_FLOOR_PLAN_AREA_B_AIR_DISTRIBUTION.tif
 008
 M202A
UPPER LEVEL FLOOR PLAN AREA A AIR DISTRIBUTION
008-M202A_UPPER_LEVEL_FLOOR_PLAN_AREA_A_AIR_DISTRIBUTION.tif
 009
 M202B
UPPER LEVEL FLOOR PLAN AREA B AIR DISTRIBUTION
009-M202B_UPPER_LEVEL_FLOOR_PLAN_AREA_B_AIR_DISTRIBUTION.tif
 010
 M202C
UPPER LEVEL FLOOR PLAN AREA C AIR DISTRIBUTION
010-M202C_UPPER_LEVEL_FLOOR_PLAN_AREA_C_AIR_DISTRIBUTION.tif
 011
 M203A
MEZZANINE FLOOR PLAN AREA A MECHANICAL
011-M203A_MEZZANINE_FLOOR_PLAN_AREA_A_MECHANICAL.tif
 012
 M203B
MEZZANINE FLOOR PLAN AREA B MECHANICAL
012-M203B_MEZZANINE_FLOOR_PLAN_AREA_B_MECHANICAL.tif
 013
 M301A
MEZZANINE FLOOR PLAN AREA A HYDRONICS
013-M301A_MEZZANINE_FLOOR_PLAN_AREA_A_HYDRONICS.tif
 014
 M301B
MEZZANINE FLOOR PLAN HYDRONICS
014-M301B_MEZZANINE_FLOOR_PLAN_HYDRONICS.tif
 015
 M301C
UPPER LEVEL FLOOR PLAN AREA C HYDRONICS
015-M301C_UPPER_LEVEL_FLOOR_PLAN_AREA_C_HYDRONICS.tif
 016
 M401
ENLARGED PLANS MECHANICAL
016-M401_ENLARGED_PLANS_MECHANICAL.tif
 017
 M402
MECHANICAL SECTIONS
017-M402_MECHANICAL_SECTIONS.tif
 018
 M403
MECHANICAL SECTIONS
018-M403_MECHANICAL_SECTIONS.tif
 019
 M500
MECHANICAL PIPING SCHEMATICS
019-M500_MECHANICAL_PIPING_SCHEMATICS.tif
 020
 M600
MECHANICAL DETAILS
020-M600_MECHANICAL_DETAILS.tif
 021
 M601
MECHANICAL DETAILS
021-M601_MECHANICAL_DETAILS.tif
 022
 M700
MECHANICAL SCHEDULES
022-M700_MECHANICAL_SCHEDULES.tif
 023
 M701
MECHANICAL SCHEDULES
023-M701_MECHANICAL_SCHEDULES.tif
 024
 M702
MECHANICAL SCHEDULES
024-M702_MECHANICAL_SCHEDULES.tif
 025
 FP101
LOWER LEVEL FLOOR PLAN FIRE PROTECTION
025-FP101_LOWER_LEVEL_FLOOR_PLAN_FIRE_PROTECTION.tif
 026
 FP102
UPPER LEVEL FLOOR PLAN FIRE PROTECTION
026-FP102_UPPER_LEVEL_FLOOR_PLAN_FIRE_PROTECTION.tif
 027
 FP103
MECHANICAL PLATFORM PLAN FIRE PROTECTION
027-FP103_MECHANICAL_PLATFORM_PLAN_FIRE_PROTECTION.tif
 028
 P100
PLUMBING LEGEND AND DETAIL
028-P100_PLUMBING_LEGEND_AND_DETAIL.tif
 029
 P200A
LOWER LEVEL FLOOR PLAN AREA A UNDERSLAB PLUMBING
029-P200A_LOWER_LEVEL_FLOOR_PLAN_AREA_A_UNDERSLAB_PLUMBING.tif
 030
 P200B
LOWER LEVEL FLOOR PLAN AREA B UNDERSLAB PLUMBING
030-P200B_LOWER_LEVEL_FLOOR_PLAN_AREA_B_UNDERSLAB_PLUMBING.tif
 031
 P201A
LOWER LEVEL FLOOR PLAN AREA A PLUMBING
031-P201A_LOWER_LEVEL_FLOOR_PLAN_AREA_A_PLUMBING.tif
 032
 P201B
LOWER LEVEL FLOOR PLAN AREA B PLUMBING
032-P201B_LOWER_LEVEL_FLOOR_PLAN_AREA_B_PLUMBING.tif
 033
 P202A
UPPER LEVEL FLOOR PLAN AREA A PLUMBING
033-P202A_UPPER_LEVEL_FLOOR_PLAN_AREA_A_PLUMBING.tif
 034
 P202B
UPPER LEVEL FLOOR PLAN AREA B PLUMBING
034-P202B_UPPER_LEVEL_FLOOR_PLAN_AREA_B_PLUMBING.tif
 035
 P202C
UPPER LEVEL FLOOR PLAN AREA C PLUMBING
035-P202C_UPPER_LEVEL_FLOOR_PLAN_AREA_C_PLUMBING.tif
 036
 P203A
MEZZANINE LEVEL PLAN AREA A PLUMBING
036-P203A_MEZZANINE_LEVEL_PLAN_AREA_A_PLUMBING.tif
 037
 P203B
MEZZANINE LEVEL PLAN AREA B PLUMBING
037-P203B_MEZZANINE_LEVEL_PLAN_AREA_B_PLUMBING.tif
 038
 P300
ENLARGED KITCHEN PLAN PLUMBING
038-P300_ENLARGED_KITCHEN_PLAN_PLUMBING.tif
 039
 P301
ENLARGED MECHANICAL ROOM PLANS PLUMBING
039-P301_ENLARGED_MECHANICAL_ROOM_PLANS_PLUMBING.tif
 040
 P400-SANITARY
WASTE AND VENT RISER DIAGRAM
040-P400-SANITARY_WASTE_AND_VENT_RISER_DIAGRAM.tif
 041
 P401
SANITARY WASTE AND VENT RISER DIAGRAM
041-P401_SANITARY_WASTE_AND_VENT_RISER_DIAGRAM.tif
 042
 P402
SANITARY WASTE AND VENT RISER DIAGRAM
042-P402_SANITARY_WASTE_AND_VENT_RISER_DIAGRAM.tif
 043
 UE100
SITE UTILITIES PLAN ELECTRICAL DEMOLITION
043-UE100_SITE_UTILITIES_PLAN_ELECTRICAL_DEMOLITION.tif
 044
 UE101
SITE UTILITIES PLAN NEW ELECTRICAL
044-UE101_SITE_UTILITIES_PLAN_NEW_ELECTRICAL.tif
 045
 E100
ELECTRICAL LEGEND AND GENERAL NOTES
045-E100_ELECTRICAL_LEGEND_AND_GENERAL_NOTES.tif
 046
 E101
UPPER LEVEL FLOOR PLAN AREA C ELECTRICAL DEMOLITION
046-E101_UPPER_LEVEL_FLOOR_PLAN_AREA_C_ELECTRICAL_DEMOLITION.tif
 047
 E201A
LOWER LEVEL FLOOR PLAN AREA A LIGHTING
047-E201A_LOWER_LEVEL_FLOOR_PLAN_AREA_A_LIGHTING.tif
 048
 E201B
LOWER LEVEL FLOOR PLAN AREA B LIGHTING
048_E201B_LOWER_LEVEL_FLOOR_PLAN_AREA_B_LIGHTING.tif
 049
 E202A
UPPER LEVEL FLOOR PLAN AREA A LIGHTING
049-E202A_UPPER_LEVEL_FLOOR_PLAN_AREA_A_LIGHTING.tif
 050
 E202B
UPPER LEVEL FLOOR PLAN AREA B LIGHTING
050-E202B_UPPER_LEVEL_FLOOR_PLAN_AREA_B_LIGHTING.tif
 051
 E202C
UPPER LEVEL FLOOR PLAN AREA C LIGHITNG
051-E202C_UPPER_LEVEL_FLOOR_PLAN_AREA_C_LIGHITNG.tif
 052
 E301A
LOWER LEVEL-FLOOR PLAN AREA A POW SYS
052-E301A_LOWER_LEVEL-FLOOR_PLAN_AREA_A_POW_SYS.tif
 053
 E301B
LOWER LEVEL FLOOR PLAN AREA B POW SYS
053-E301B_LOWER_LEVEL_FLOOR_PLAN_AREA_B_POW_SYS.tif
 054
 E02A
UPPER LEVEL FLOOR AREA A POW SYS
054-E02A_UPPER_LEVEL_FLOOR_AREA_A_POW_SYS.tif
 055
 E302B
UPPER LEVEL FLOOR PLAN AREA B POW SYS
055-E302B_UPPER_LEVEL_FLOOR_PLAN_AREA_B_POW_SYS.tif
 056
 E302C
UPPER LEVEL FLOOR PLAN AREA C POW SYS
056-E302C_UPPER_LEVEL_FLOOR_PLAN_AREA_C_POW_SYS.tif
 057
 E401A
MEZZ LEVEL PLAN AREA A ELECTRICAL
057-E401A_MEZZ_LEVEL_PLAN_AREA_A_ELECTRICAL.tif
 058
 E401B
MEZZ LEVEL PLAN AREA B ELECTRICAL
058-E401B_MEZZ_LEVEL_PLAN_AREA_B_ELECTRICAL.tif
 059
 E401C
MEZZ LEVEL INTERCONNECTION PLAN
059-E401C_MEZZ_LEVEL_INTERCONNECTION_PLAN.tif
 060
 E500
ENLARGED CLASSROOM PLANS ELECTRICAL
060-E500_ENLARGED_CLASSROOM_PLANS_ELECTRICAL.tif
 061
 E501
ENLARGED FLOOR PLANS ELECTRICAL
061-E501_ENLARGED_FLOOR_PLANS_ELECTRICAL.tif
 062
 E502
ENLARGED FLOOR PLANS ELECTRICAL
062-E502_ENLARGED_FLOOR_PLANS_ELECTRICAL.tif
 063
 E600
ELECTRICAL SCHEDULES RISERS AND DETAILS
063-E600_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 064
 E601
ELECTRICAL SCHEDULES RISERS AND DETAILS
064-E601_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 065
 E602
ELECTRICAL SCHEDULES RISERS AND DETAILS
065-E602_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 066
 E603
ELECTRICAL SCHEDULES RISERS AND DETAILS
066-E603_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 067
 E604
ELECTRICAL SCHEDULES RISERS AND DETAILS
067-E604_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 068
 E605
ELECTRICAL SCHEDULES RISERS AND DETAILS
068-E605_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 069
 E606
ELECTRICAL SCHEDULES RISERS AND DETAILS
069-E606_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 070
 E607
ELECTRICAL SCHEDULES RISERS AND DETAILS
070-E607_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 071
 E608
ELECTRICAL SCHEDULES RISERS AND DETAILS
071-E608_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 072
 E609
ELECTICAL SCHEDULES RISERS AND DETAILS
072-E609_ELECTICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 073
 E610
ELECTRICAL SCHEDULES RISERS AND DETAILS
073-E610_ELECTRICAL_SCHEDULES_RISERS_AND_DETAILS.tif
 074
 E700
ELECTRICAL POWER RISER
074-E700_ELECTRICAL_POWER_RISER.tif
 075
 E701
PANELBOARD SCHEDULES
075-E701_PANELBOARD_SCHEDULES.tif
 076
 E702
PANELBOARD SCHEDULES
076-E702_PANELBOARD_SCHEDULES.tif
 077
 E703
PANELBOARD SCHEDULES
077-E703_PANELBOARD_SCHEDULES.tif
 001
 3 of 18
Existing Building Floor Plan
001-3_OF_18_Existing_Building_Floor_Plan.tif
 002
 4 of 18
Existing Building Roof Plan
002-4_of_18_Existing_Building_Roof_Plan.tif
 003
 5 of 18
Building Elevations
003-5_of_18_Existing_Building_Elevations.tif
 004
 13 of 18
Existing Building Underfloor Piping Plan
004-13_of_18_Existing_Building_Underfloor_Piping_Plan.tif
 005
 1 of 1
Existing Building Roof Framing Plan
005_1_of_1_Existing_Building_Roof_Framing_Plan.tif
 006
 A2
Existing Building Foundation and Floor Plan
006-A2_Existing_Building_Foundation_and_Floor_Plan.tif
 007
 A5
Existing Building
007-A5_Existing_Building.tif
 008
 2.1
Existing Building Site and Grading Plan
008-2.1_Existing_Building_Site_and_Grading_Plan.tif
 009
 3.1
Existing Building Foundation and Roof Framing Plan
009-3.1_Existing_Building_Foundation_and_Roof_Framing_Plan.tif
 010
 4.1
Existing Building Floor Plan and Room Finish Schedule
010-4.1_Existing_Building_Floor_Plan_and_Room_Finish_Schedule.tif
 011
 4.2
Existing Building Building Section and Elevations
011-4.2_Existing_Building_Building_Section_and_Elevations.tif
 012
 4.3
Existing Building Wall Sections
012-4.3_Existing_Building_Wall_Sections.tif
 013
 4.4
Existing Building Roof Plan and Detail
013-4.4_Existing_Building_Roof_Plan_and_Detail.tif
 014
 8.1
Existing Building Floor Plan HVAC
014-8.1_Existing_Building_Floor_Plan_HVAC.tif
 015
 10.2
Existing Building Electrical Floor Plan Power
015-10.2_Existing_Building_Electrical_Floor_Plan_Power.tif