Lynn Imaging Planroom

Logo

Farmhouse Fraternity

Order
 001
 CVR
Cover Sheet
001-CVR_Cover_Sheet.tif
 002
 C0.1
Code Information and Passive ystem Piping
002-C0.1_Code_Information_and_Passive_ystem_Piping.tif
 003
 SS1.0
Site Survey
003-SS1.0_Site_Survey.tif
 004
 D1.0
Site Demo Plan For Reference ONly
004-D1.0_Site_Demo_Plan_For_Reference_ONly.tif
 005
 SD1.0
Site Development Plan and Details
005-SD1.0_Site_Development_Plan_and_Details.tif
 006
 SD2.0
Drainage and Grading Plan
006-SD2.0_Drainage_and_Grading_Plan.tif
 007
 SD2.1
Erosion Sidement Control Plan
007-SD2.1_Erosion_Sidement_Control_Plan.tif
 008
 SD4.0
Site Details
008-SD4.0_Site_Details.tif
 009
 SD4.1
Site Details
009-SD4.1_Site_Details.tif
 010
 L1.0
Landscape Plan and Details
010-L1.0_Landscape_Plan_and_Details.tif
 011
 S0.1
Structural Notes
011-S0.1_Structural_Notes.tif
 012
 S0.2
Structural Notes Special Inspections
012-S0.2_Structural_Notes_Special_Inspections.tif
 013
 S1.1
Foundation Plan
013-S1.1_Foundation_Plan.tif
 014
 S1.2
Second and Third Floor Framing Plans
014-S1.2_Second_and_Third_Floor_Framing_Plans.tif
 015
 S1.3
Roof Framing Plan
015-S1.3_Roof_Framing_Plan.tif
 016
 S2.0
Typical Concrete Details
016-S2.0_Typical_Concrete_Details.tif
 017
 S2.1
Foundation Sections and Details
017-S2.1_Foundation_Sections_and_Details.tif
 018
 S2.2
Foundation Sections and Details
018-S2.2_Foundation_Sections_and_Details.tif
 019
 S3.1
Typical Steel Framing Details
019-S3.1_Typical_Steel_Framing_Details.tif
 020
 S3.2
Shear Wall Notes and Details Wood Stud Framing Details
020-S3.2_Shear_Wall_Notes_and_Details_Wood_Stud_Framing_Details.tif
 021
 S3.3
Shear Wall Notes and Details Wood Stud Framing Details
021-S3.3_Shear_Wall_Notes_and_Details_Wood_Stud_Framing_Details.tif
 022
 S3.4
Wood Framed Construction Sections and Details
022-S3.4_Wood_Framed_Construction_Sections_and_Details.tif
 023
 S3.5
Wood Framed Construction Sections and Details
023-S3.5_Wood_Framed_Construction_Sections_and_Details.tif
 024
 S3.6
Wood Framed Construction Sections and Details
024-S3.6_Wood_Framed_Construction_Sections_and_Details.tif
 025
 S3.7
Wood Framed Construction Sections and Details
025-S3.7_Wood_Framed_Construction_Sections_and_Details.tif
 026
 S3.8
Wood Framed Construction Sections and Details
026-S3.8_Wood_Framed_Construction_Sections_and_Details.tif
 027
 S4.0
Masonry Header Beam Schedule Typical Masonry details
027-S4.0_Masonry_Header_Beam_Schedule_Typical_Masonry_details.tif
 028
 A0.1
Abbrvs Wall Partition Schedule Symbols Legend and General Notes
028-A0.1_Abbrvs_Wall_Partition_Schedule_Symbols_Legend_and_General_Notes.tif
 029
 A1.1
First and Second Floor Plans
029-A1.1_First_and_Second_Floor_Plans.tif
 030
 A1.2
Third Floor Plan and Enlarged Plans
030-A1.2_Third_Floor_Plan_and_Enlarged_Plans.tif
 031
 A1.3
Roof Plan and Details
031-A1.3_Roof_Plan_and_Details.tif
 032
 A2.1
Enlarged Stair Plans and Details
032-A2.1_Enlarged_Stair_Plans_and_Details.tif
 033
 A2.2
Enlarged Stair Plans and Details
033-A2.2_Enlarged_Stair_Plans_and_Details.tif
 034
 A3.1
Building Elevations
034-A3.1_Building_Elevations.tif
 035
 A4.1
Sections and Details
035-A4.1_Sections_and_Details.tif
 036
 A5.1
Details
036-A5.1_Details.tif
 037
 A7.1
Door Schedule and Door and Window Details
037-A7.1_Door_Schedule_and_Door_and_Window_Details.tif
 038
 A8.1
Reflected Ceiling Plans
038-A8.1_Reflected_Ceiling_Plans.tif
 039
 FS1.1
Enlarged Kitchen Plan and Equipment Schedule and Details
039-FS1.1_Enlarged_Kitchen_Plan_and_Equipment_Schedule_and_Details.tif
 040
 SU1.1
Site Utiltiies Plan
040-SU1.1_Site_Utiltiies_Plan.tif
 041
 M1.1
First and Second Floor HVAC Plans
041-M1.1_First_and_Second_Floor_HVAC_Plans.tif
 042
 M1.2
Third Floor and Attic HVAC Plans
042-M1.2_Third_Floor_and_Attic_HVAC_Plans.tif
 043
 M2.1
First and Second Floor HVAC Piping Plans
043-M2.1_First_and_Second_Floor_HVAC_Piping_Plans.tif
 044
 M2.2
Third Floor HVAC Piping Plan
044-M2.2_Third_Floor_HVAC_Piping_Plan.tif
 045
 M3.1
Mechanical Details
045-M3.1_Mechanical_Details.tif
 046
 M3.2
Mechanical SDetails and Schedules
046-M3.2_Mechanical_SDetails_and_Schedules.tif
 047
 P1.1
First and Second Floor Plumbing Plans
047-P1.1_First_and_Second_Floor_Plumbing_Plans.tif
 048
 P1.2
Third Floor and Enlarged Kitchen Plumbing Plans
048-P1.2_Third_Floor_and_Enlarged_Kitchen_Plumbing_Plans.tif
 049
 P2.1
Plumbing Risers
049-P2.1_Plumbing_Risers.tif
 050
 P2.2
Plumbing Risers
050-P2.2_Plumbing_Risers.tif
 051
 P3.1
Plumbing Details and Schedules
051-P3.1_Plumbing_Details_and_Schedules.tif
 052
 FP1.1
First and Second Floor Fire Protection Plan
052-FP1.1_First_and_Second_Floor_Fire_Protection_Plan.tif
 053
 FP1.2
Third Floor and Attic Fire Protection Plan
053-FP1.2_Third_Floor_and_Attic_Fire_Protection_Plan.tif
 054
 E1.1
First and Second Floor Lighting Plans
054-E1.1_First_and_Second_Floor_Lighting_Plans.tif
 055
 E1.2
Third Floor Lighting Plan
055-E1.2_Third_Floor_Lighting_Plan.tif
 056
 E2.1
First and Second Floor Power Plans
056-E2.1_First_and_Second_Floor_Power_Plans.tif
 057
 E2.2
Third Floor Power Plan
057-E2.2_Third_Floor_Power_Plan.tif
 058
 E2.3
Enlarged Kitchen Power Plan
058-E2.3_Enlarged_Kitchen_Power_Plan.tif
 059
 E3.1
First and Second Floor Signals and Communications Plans
059-E3.1_First_and_Second_Floor_Signals_and_Communications_Plans.tif
 060
 E3.2
Third Floor Signals and Communications Plan
060-E3.2_Third_Floor_Signals_and_Communications_Plan.tif