Pre-Bid Information
09/11/2012 03:00 PM
Lincoln Co Senior Citizens Building
US Hwy 27 North
Description
Please Note Addendum 03 has changed the bid date to 09-24-12
Wellness Center Addition of approx. 2800 SQ FT addition over partial basement. The structure is a stick frame brick veneer with some structural steel components. Reinforced concrete/masonry foundations and basement walls. Slab on grade and concrete on metal deck over steel bar joist floors over basement section of the project. Lean concrete fill for trench foundations.
Foundation drain system and stone fill. Dimensional shingle roofing over 30 LBS underlayment and 5/8" plywood roof deck. Alum gutters and down spouts. Roof trusses and portions of stick frame gable framing components. 2x6 exterior wall framing and finish carpentry - casework and wood trims, solid core doors and hollow metal door frames, aluminum clad wood windows, fiberglass insulation, aluminum facia and trim. Drywall systems, acoustic ceiling systems, painting, carpet, vct tile, ceramic tile. Forced air HVAC heat pump, plumbing and fixtures, electrical service and fixtures. Minor site development, excavation. Minor site utility connections. Site concrete, minor landscaping.
Job Purchase Information:
General Contractors
A complete set of plans and specifications is available for a refundable deposit of $75.00, payable to VanHook Architects. We must receive a check for this amount.
Sub-Contractors
A complete set of plans and specifications is available for a non-refundable purchase of $28.36, payable to Lynn Imaging.
There will be a $22.00 shipping charge for each set shipped UPS Ground. There will be a $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS).
Please note we only ship Fed-Ex on a customer's shipper number that delivery surcharges are subject to change.
Mail checks to Lynn Imaging, Attn: Distribution, 328 Old Vine Street, Lexington KY 40507.