{"id":29861,"date":"2026-06-05T13:33:15","date_gmt":"2026-06-05T18:33:15","guid":{"rendered":"https:\/\/www.lynnimaging.com\/bids\/2026\/06\/05\/rfb-11-27-eec-aml-24043amlbaml\/"},"modified":"2026-06-05T13:33:15","modified_gmt":"2026-06-05T18:33:15","slug":"rfb-11-27-eec-aml-24043amlbaml","status":"publish","type":"post","link":"https:\/\/www.lynnimaging.com\/bids\/2026\/06\/05\/rfb-11-27-eec-aml-24043amlbaml\/","title":{"rendered":"RFB-11-27 EEC-AML-24043AMLBAML"},"content":{"rendered":"<p><b>RFB-11-27 EEC-AML-24043AMLBAML<\/b><\/p>\n<p>Estimated Length of Project:<br \/>\n(Substantial Completion) + 270 Calendar Days (Final Completion)<\/p>\n<p>The Ruth Mullins site will consist of the construction of 60 Liner Foot of Non-Reinforced Block Wall Type I at the side of residence along with 210 Linear Foot of 8\u201d Subdrain to promote positive drainage behind residence and along driveway. The replacement of 20 Linear Foot of 24\u201d HDPE pipe for drainage from sub-drain and drainage from behind the storage building. Replace in kind Concrete block steps at the back of residence. County\/FEMA has reconstructed her driveway, the remaining work will consist of repairing a sinkhole in the driveway and paving and guardrail for safety.<br \/>\nThe Clyde Mullins site will consist of a 128 LF Reinforced Concrete Wall to stabilize the area behind his house. The construction of 64 LF of subdrain will drain runoff that is running behind the Ruth Mullins residence. The subdrain from the Reinforced Concrete Wall will be tied to a junction box that will collect water from the yard and carry it in a replaced 18 \u201c HDPE pipe across the drive. Additional subdrain is added to remove water from a portal behind the house above Clyde\u2019s. The subdrain will be tied into the backfill from an existing AML gabion wall in front of the house.<\/p>\n<p><b>Project Location:<\/b>  Perry County<\/p>\n<p><a href=\"\/View\/ViewJob.aspx?job_id=29433\">More Details<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>RFB-11-27 EEC-AML-24043AMLBAML Estimated Length of Project: (Substantial Completion) + 270 Calendar Days (Final Completion) The Ruth Mullins site will consist of the construction of 60 Liner Foot of Non-Reinforced Block Wall Type I at the side of residence along with 210 Linear Foot of 8\u201d Subdrain to promote positive drainage behind residence and along driveway. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/posts\/29861"}],"collection":[{"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/comments?post=29861"}],"version-history":[{"count":0,"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/posts\/29861\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/media?parent=29861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/categories?post=29861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lynnimaging.com\/bids\/wp-json\/wp\/v2\/tags?post=29861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}