Lynn Imaging Planroom

Logo

Paul Laurence Dunbar High School Synthetic Turf Replacement - Athletic Field

Order

Paul Laurence Dunbar High School Synthetic Turf Replacement - Athletic Field

Contact

Company Contact

Pearson and Peters Architects
Jeffrey Pearson
Location

Location

Lexington, KY

Pre-Bid Information

Pre-Bid Information

Bid Information

Bid Information

04/30/2013 02:00 PM ET
FCPS Department of Physical Support Services Conference Room
400 Springhill Drive
Lexington, KY

Description

Description

Removal and partial recycling of the existing synthetic turf athletic field, reworking the existing perimeter drainage, addition of storm drain piping, installation on concrete pole vault runway and landing area, installation of new football field goal posts, installation of discus pole sleeve supports, reworking of the existing gravel sub base and final laser grading, installation of geotextile fabric, shock drainage pad, and synthetic turf system with rubber/sand mix infill. The area of field replacement is the total area inside the existing perimeter track system – totaling approximately 119,500 SF EACH. All existing track surfaces, and other existing appurtenances shall be protected and not damaged during construction of the turf replacement.

Job Purchase Information:

A complete set of Plans and Specifications is available for a non-refundable purchase of $50.00, payable to Lynn Imaging.

There will be a $22.00 shipping charge for each set shipped UPS Ground. There will be a $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS). Please note we only ship Fed-Ex on a customer's shipper number and that delivery surcharges are subject to change.

Mail checks to Lynn Imaging, Attn: Distribution, 328 Old Vine Street, Lexington KY 40507.

Addenda

  • 04/26/2013 - Paul Laurence Dunbar HS Synthetic Turf Add01 04-26-13 Email 04-26-13