Pre-Bid Information
01/16/2013 03:00 PM ET
Commonwealth Stadium Wildcat Den
Description
Construction of a new 1,195 seat stadium with an elevated press box and team facilities on the first level. The structure is CMU and steel framed with concrete slab on metal deck. The grandstand consists of steel angle frame type aluminum bleachers on concrete concourse slab. Approximately 663 chair back and 532 bench back seats will be provided. The team facility includes two team locker rooms with shower areas, two team lounges and space for training, officials and visiting teams. Two bridges will connect the Soccer Complex to the existing Softball Stadium.
Demolition work includes the removal of existing bleacher concrete slab foundations (bleachers to be removed by owner). The work includes foundations, steel structure, concrete masonry unit walls, concrete slabs, brick finish, grandstands and steating systems, metal wall panel systems, TPO roofing system, glazing systems, finishes, mechanical and electrical systems; The facility is a Type 2B Construction per the Kentucky Building Code.