Buechel Basin Wastewater Systems – Phase IB and II (Alternate) Project

Buechel Basin Wastewater Systems – Phase IB and II (Alternate) Project

Louisville, KY

Phase IB of this project consists of the construction of two surge basins (one concrete, with the other earthen), chemical stabilization using lime, wet well with three high-capacity pumps, rock anchors, effluent gate structure, return flow valve vault, groundwater pump station, above-ground water storage tank, electrical building, standby generation systems, several low capacity pumps, screening building, perimeter drains, landscaping, buried piping, storm drainage, etc. associated with this project. Phase II of this project will be bid as an alternate to Phase IB and consists of construction of an earthen surge basin (approx.87.5 MG), chemical stabilization using lime, buried piping, two high-capacity pumps, landscaping, storm drainage, etc. associated with this project. All excess soil and rock will be stockpiled on-site for each Phase. The project is located to the south of Produce Road, east of Poplar Level Road and west of Jennings Lane.

Click Here to Order